Construction Invoice Generator

Create a professional construction invoice with site address, progress-claim number, retention and contract reference fields, then download as a clean PDF — free, no sign-up required.

自社情報

請求先情報

ロゴ設定

ロゴを追加

請求書詳細

明細

消費税
¥0.00
消費税
¥0.00
消費税
¥0.00
消費税
¥0.00
消費税
¥0.00
消費税
¥0.00
消費税
¥0.00
消費税
¥0.00
小計:¥0.00
¥0.00
(%)
¥0.00

消費税はチェックされた明細項目にのみ適用されます。

合計:¥0.00
¥0.00
残高:¥0.00

署名

承認済み署名を追加できます。署名した場合のみプレビューとPDFに表示されます。

プレビュー:

ここに署名が表示されます

無料請求書アプリ

Invoice24 ロゴ

世界で 300万以上 の事業者に利用されています

スマートフォンから数秒で請求書を送信し、入金管理やキャッシュフロー管理を簡単に行えます。

App StoreでダウンロードGoogle Playで入手
Your Business
請求書
請求先情報
発行日
内容数量単価金額
Site preparation & set-out — labour, 1 day1¥0.00¥0.00
Materials — timber, fixings & consumables (supply)1¥0.00¥0.00
Labour — carpentry & installation, 24 hrs @ hourly rate24¥0.00¥0.00
Plant & equipment hire — mini excavator, 2 days2¥0.00¥0.00
Subcontract works — electrical rough-in1¥0.00¥0.00
Variation VO-002 — additional waterproofing (approved — add date)1¥0.00¥0.00
Waste removal & final site clean1¥0.00¥0.00
Less previously claimed — claims 1–21¥0.00¥0.00
小計¥0.00
消費税 (10%)¥0.00
合計¥0.00

Free construction invoice generator & template

Create a professional construction invoice in minutes. Add the project name, site address, progress-claim number and retention withheld, split materials from labour, and download a clean PDF — free, with no sign-up required. This page covers general building and multi-trade construction projects with progress or milestone billing; for a single small job, see your trade's own invoice generator.

What should a construction invoice include?

Beyond the standard invoice fields, a construction invoice needs to identify the project and site, tie back to the contract, and show where this bill sits in a run of progress payments. On subcontracting chains it also needs to carry the correct statutory VAT wording — getting this wrong is the single thing contractors worry about most.

  • Project/job name and number, matching your contract documents
  • Site address, if different from the billing address
  • Contract, quote or purchase order reference, plus any approved variation numbers
  • Progress claim number and billing period (e.g. "Progress claim 3 — 1–30 Jun 2026")
  • Materials and labour split onto separate lines — this is a legal requirement in several markets, not just good practice
  • Retention withheld, and when it will be released
  • Any reverse-charge or withholding wording your market requires (see below)

Reverse charge, withholding and retention — the three mechanisms that layer on construction invoices

Construction is unusual because up to three separate tax mechanisms can apply to the same invoice. First, around 18 of the markets we cover shift VAT onto the customer for B2B subcontracting under a domestic reverse charge (UK, Germany, France, Italy, and most other EU states) — the subcontractor charges 0% VAT and prints a statutory notice; the customer self-accounts for the tax instead. Second, several markets run a separate withholding scheme on top of VAT: the UK's Construction Industry Scheme (CIS) deducts 20% (registered), 30% (unregistered) or 0% (gross status) from the labour element of a subcontractor's pay; Germany's Bauabzugsteuer withholds 15% of the gross invoice unless the contractor holds a valid Freistellungsbescheinigung (§48b EStG); Brazil withholds 11% INSS (or 3.5% under Simples Nacional Anexo IV) on labour in cession/empreitada contracts; Indonesia withholds PPh Final Pasal 4(2) at 1.75–6% depending on SBU qualification. Because this tool only ever calculates one VAT rate, these withholding amounts are never computed automatically — the invoice prints the statutory notice with a blank for you to fill in, and your accounting system (or the customer, under CIS) handles the actual deduction. Third, retention (typically 5–10% of each claim, released later at practical completion or after a defects period) reduces what's payable now without changing the contract value — model this using the discount field, which keeps VAT calculated on the amount actually being claimed now, and use the retention field to record the release terms for reference.

Progress billing and variations

On anything beyond a small job, invoices are usually issued per stage or per month rather than once at the end. Give each claim a number and billing period, and if earlier claims have already been paid, add a negative "less previously claimed" line so the invoice only asks for the balance still owed — this keeps the VAT/GST base correct in every market, unlike trying to invoice the full cumulative value each time. Approved change orders or variations should appear as their own line item referencing the variation number and approval date, so both parties can trace exactly what was agreed and when.

日本向け請求書作成ツール

FAQs about construction invoices