建物解体工事契約書 — 日本向けテンプレート

更新日 2026年11月20日

建物解体工事契約書の日本向けテンプレートです。解体範囲、工程、許可・届出、安全、廃棄物、引渡しを、記入欄、期限、例外、証拠資料とともに整理します。

建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件を確認するための出発点ですが、結論は事実、契約、当事者、場所、必要な許可や届出によって異なります。公的な申請書や法的助言ではありません。

36項目中4項目を入力済み

下の書面でハイライトされた項目をタップして、そのまま入力してください。無料 — 登録不要、透かしなし

書式を選択

Demolition Contract

This Demolition Contract is made on between of (the "Contractor"), holding state licence or registration number , and of (the "Owner").

1. Property and structures

Property address:
Legal description:
Structures to be demolished:

The Owner warrants that it has lawful authority to authorise the demolition of the structures described, that it has disclosed to the Contractor all hazardous conditions, buried structures, tanks and services of which it is aware, and that no third party has an interest in the structures that would prevent their demolition.

2. Scope of work

The Contractor will demolish the structures described above, remove all resulting debris and waste from the site, and leave the site in the following condition: . The work will be performed in a good and workmanlike manner, in accordance with applicable law and the conditions of the demolition permit.

The following are expressly excluded from the scope and are not included in the Contract Price: . Any service not expressly included is excluded unless agreed by written change order.

3. Conditions precedent to mobilisation

The Contractor will not mobilise plant to the site, and demolition will not begin, until each of the following has been completed and evidence has been provided to the other party:

  • a thorough inspection of the affected facility for the presence of asbestos, including Category I and Category II non-friable asbestos-containing material, commissioned by with the report provided by ;
  • the written regulatory notification required for the demolition, filed by by , which must be postmarked or delivered at least ten working days before any activity that would disturb asbestos-containing material and, for a demolition, whether or not asbestos is found;
  • the demolition permit, obtained by , with a copy provided to the other party;
  • an engineering survey of the structures and of any adjacent structure where workers may be exposed, made by a competent person — — covering the condition of the framing, floors and walls and the possibility of unplanned collapse, with the written record retained and available on request;
  • confirmation that all service lines have been shut off, capped or otherwise controlled outside the building line, with the relevant utility companies notified in advance;
  • an underground facility locate request submitted at least working days before any excavation, with the ticket number recorded in the site file.

If an unmarked underground facility is encountered, the Contractor will stop work in that area immediately, notify the facility owner and the Owner, and not resume until the position has been resolved.

4. Hazardous materials found despite the survey

If asbestos, lead-based paint, mercury-containing devices, PCB-containing equipment, refrigerants, an underground storage tank or any other regulated material is encountered that was not identified in the survey, the Contractor will stop work in the affected area, secure it, and notify the Owner immediately. The additional work will be priced and agreed by written change order before it proceeds. The cost is borne by the Owner, except to the extent the material should reasonably have been identified by a survey for which the Contractor was responsible.

5. Salvage and scrap

All salvage, scrap and materials arising from the demolition become the property of the Contractor on removal from the structure, and the Contract Price has been set on that basis.

6. Waste handling and documentation

The Contractor will transport and dispose of all waste only at facilities permitted to receive it, will handle each regulated waste stream in accordance with the requirements applying to it, and will deliver to the Owner copies of all manifests, weight tickets and certificates of disposal within fourteen days of completion.

任意Set a waste diversion target

7. Site controls and the neighbours

Work will be carried out only during . The Contractor will implement dust suppression, manage water used for suppression so that it does not discharge unlawfully from the site, and take reasonable measures to limit noise and disturbance to neighbouring occupiers.

任意Include a pre-condition survey of adjoining properties

Before mobilisation the Contractor will carry out a photographic pre-condition survey of the adjoining properties, boundaries, walls, driveways and highways likely to be affected, and will provide a copy to the Owner. The survey is evidence of the condition of those features before the work began.

任意Include vibration monitoring
任意Include site security and hoarding

The Contractor will secure the site with fencing or hoarding and appropriate warning signage, will keep the site secure outside working hours, and is responsible for preventing unauthorised access for the duration of the work.

任意Include pest and rodent treatmentSeveral municipalities require this as a demolition permit condition.

8. Insurance

Before mobilisation and throughout the work, the Contractor will maintain at its own expense:

  • commercial general liability insurance of not less than ;
  • commercial automobile liability insurance of not less than ;
  • workers’ compensation and employer’s liability insurance as required by the law of the state in which the work is performed;
  • contractor’s pollution liability insurance of not less than , general liability policies commonly excluding pollution.

The Owner will be named as an additional insured on the liability policies, the policies will include a waiver of subrogation in favour of the Owner and will be primary and non-contributory. Certificates of insurance will be provided by and on each renewal, and the Contractor will give the Owner written notice of cancellation, non-renewal or material change.

任意Require payment and performance bonds

9. Contract price and payment

The Contract Price is . 支払 is made as follows: . Each payment is due within days of a valid invoice. Overdue amounts may bear interest at % per month or the maximum rate permitted by applicable law, whichever is lower.

任意Withhold retainage

The Owner will withhold retainage of % from each progress payment. Retainage is released on substantial completion of the work, delivery of the waste documentation and receipt of the unconditional lien waivers, subject to any limit or release timetable imposed by applicable state law.

任意Require lien waivers with each payment

With each progress payment the Contractor will deliver conditional waivers and releases of lien from itself and from each subcontractor and supplier for the amount covered by that payment, and on final payment will deliver unconditional waivers and releases from all of them.

10. Schedule

Work will commence on or about , subject to the conditions precedent being satisfied, and is to be substantially complete by . The completion date is extended by delay caused by weather, concealed or unforeseen site conditions, governmental action, late permit issue, labour disputes or other events beyond the Contractor’s reasonable control, with the Contractor notifying the Owner promptly of any such delay.

11. Change orders

No change to the scope, the Contract Price or the schedule takes effect unless recorded in a written change order signed by both parties, stating the change, the price adjustment and the schedule impact. Verbal instructions do not vary this contract and the Contractor is not obliged to act on them.

12. Indemnity and limitation of liability

Each party will indemnify the other against claims, damages, losses and reasonable costs arising from its own negligent acts or omissions, breach of this contract or breach of applicable law. The Owner will additionally indemnify the Contractor against claims arising from hazardous conditions the Owner knew of and did not disclose.

Except for liability arising from fraud, wilful misconduct, bodily injury, death, or any liability that cannot lawfully be limited, each party’s total liability under this contract is limited to , and neither party is liable to the other for indirect, incidental, special or consequential damages, including loss of profit, loss of rent and loss of use.

13. Termination

Either party may terminate on written notice if the other materially breaches this contract and fails to remedy the breach within days of written notice. The Owner may terminate for convenience on written notice, in which case the Contractor is entitled to payment for work properly performed to the termination date together with reasonable demobilisation costs.

On termination for any reason the Contractor will immediately cease operations, leave the site in a safe and secure condition with any partially demolished structure made stable, remove its plant, and submit a final invoice for amounts properly due.

14. General

  • Amendment: only by a written document signed by both parties.
  • Assignment: neither party may assign without the other’s written consent, except to a successor in a sale of the business or the property that assumes these obligations.
  • Entire agreement: this contract, the scope documents and any signed change orders are the whole agreement on their subject matter.
  • Severability: if any provision is invalid or unenforceable the rest continues in force.
  • Notices: in writing, delivered by hand, recognised courier, certified mail or email with confirmation of receipt, to the addresses above.
  • Counterparts and electronic signature: this contract may be signed in counterparts and electronically.

15. Governing law and disputes

This contract is governed by the laws of the State of . The parties will first attempt to resolve any dispute by good-faith negotiation between senior representatives, and failing that will submit it to the courts or forum at .

Contractor

Date signed:

Property Owner

Date signed:

目的と適用範囲

日本では、解体範囲、工程、許可・届出、安全、廃棄物、引渡しを具体的な事実、日付、添付資料で記載します。建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件は確認の出発点であり、すべての事案で自動的に結論を決めるものではありません。第1項では、当事者間で合意できる事項と、取得・通知・立証・行政機関や専門家への確認が必要な事項を分けます。担当者、範囲、期限、証拠の保存方法を記録し、後で内容を追跡できるようにします。

日本では、解体範囲、工程、許可・届出、安全、廃棄物、引渡しを具体的な事実、日付、添付資料で記載します。建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件は確認の出発点であり、すべての事案で自動的に結論を決めるものではありません。第2項では、当事者間で合意できる事項と、取得・通知・立証・行政機関や専門家への確認が必要な事項を分けます。担当者、範囲、期限、証拠の保存方法を記録し、後で内容を追跡できるようにします。

当事者と権限

日本では、解体範囲、工程、許可・届出、安全、廃棄物、引渡しを具体的な事実、日付、添付資料で記載します。建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件は確認の出発点であり、すべての事案で自動的に結論を決めるものではありません。第2項では、当事者間で合意できる事項と、取得・通知・立証・行政機関や専門家への確認が必要な事項を分けます。担当者、範囲、期限、証拠の保存方法を記録し、後で内容を追跡できるようにします。

日本では、解体範囲、工程、許可・届出、安全、廃棄物、引渡しを具体的な事実、日付、添付資料で記載します。建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件は確認の出発点であり、すべての事案で自動的に結論を決めるものではありません。第3項では、当事者間で合意できる事項と、取得・通知・立証・行政機関や専門家への確認が必要な事項を分けます。担当者、範囲、期限、証拠の保存方法を記録し、後で内容を追跡できるようにします。

義務・成果物の具体化

日本では、解体範囲、工程、許可・届出、安全、廃棄物、引渡しを具体的な事実、日付、添付資料で記載します。建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件は確認の出発点であり、すべての事案で自動的に結論を決めるものではありません。第3項では、当事者間で合意できる事項と、取得・通知・立証・行政機関や専門家への確認が必要な事項を分けます。担当者、範囲、期限、証拠の保存方法を記録し、後で内容を追跡できるようにします。

日本では、解体範囲、工程、許可・届出、安全、廃棄物、引渡しを具体的な事実、日付、添付資料で記載します。建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件は確認の出発点であり、すべての事案で自動的に結論を決めるものではありません。第4項では、当事者間で合意できる事項と、取得・通知・立証・行政機関や専門家への確認が必要な事項を分けます。担当者、範囲、期限、証拠の保存方法を記録し、後で内容を追跡できるようにします。

価格、税、支払

日本では、解体範囲、工程、許可・届出、安全、廃棄物、引渡しを具体的な事実、日付、添付資料で記載します。建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件は確認の出発点であり、すべての事案で自動的に結論を決めるものではありません。第4項では、当事者間で合意できる事項と、取得・通知・立証・行政機関や専門家への確認が必要な事項を分けます。担当者、範囲、期限、証拠の保存方法を記録し、後で内容を追跡できるようにします。

日本では、解体範囲、工程、許可・届出、安全、廃棄物、引渡しを具体的な事実、日付、添付資料で記載します。建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件は確認の出発点であり、すべての事案で自動的に結論を決めるものではありません。第5項では、当事者間で合意できる事項と、取得・通知・立証・行政機関や専門家への確認が必要な事項を分けます。担当者、範囲、期限、証拠の保存方法を記録し、後で内容を追跡できるようにします。

期限、承認、証拠

日本では、解体範囲、工程、許可・届出、安全、廃棄物、引渡しを具体的な事実、日付、添付資料で記載します。建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件は確認の出発点であり、すべての事案で自動的に結論を決めるものではありません。第5項では、当事者間で合意できる事項と、取得・通知・立証・行政機関や専門家への確認が必要な事項を分けます。担当者、範囲、期限、証拠の保存方法を記録し、後で内容を追跡できるようにします。

日本では、解体範囲、工程、許可・届出、安全、廃棄物、引渡しを具体的な事実、日付、添付資料で記載します。建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件は確認の出発点であり、すべての事案で自動的に結論を決めるものではありません。第6項では、当事者間で合意できる事項と、取得・通知・立証・行政機関や専門家への確認が必要な事項を分けます。担当者、範囲、期限、証拠の保存方法を記録し、後で内容を追跡できるようにします。

個人情報と保存

日本では、解体範囲、工程、許可・届出、安全、廃棄物、引渡しを具体的な事実、日付、添付資料で記載します。建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件は確認の出発点であり、すべての事案で自動的に結論を決めるものではありません。第6項では、当事者間で合意できる事項と、取得・通知・立証・行政機関や専門家への確認が必要な事項を分けます。担当者、範囲、期限、証拠の保存方法を記録し、後で内容を追跡できるようにします。

日本では、解体範囲、工程、許可・届出、安全、廃棄物、引渡しを具体的な事実、日付、添付資料で記載します。建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件は確認の出発点であり、すべての事案で自動的に結論を決めるものではありません。第7項では、当事者間で合意できる事項と、取得・通知・立証・行政機関や専門家への確認が必要な事項を分けます。担当者、範囲、期限、証拠の保存方法を記録し、後で内容を追跡できるようにします。

責任と終了

日本では、解体範囲、工程、許可・届出、安全、廃棄物、引渡しを具体的な事実、日付、添付資料で記載します。建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件は確認の出発点であり、すべての事案で自動的に結論を決めるものではありません。第7項では、当事者間で合意できる事項と、取得・通知・立証・行政機関や専門家への確認が必要な事項を分けます。担当者、範囲、期限、証拠の保存方法を記録し、後で内容を追跡できるようにします。

日本では、解体範囲、工程、許可・届出、安全、廃棄物、引渡しを具体的な事実、日付、添付資料で記載します。建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件は確認の出発点であり、すべての事案で自動的に結論を決めるものではありません。第8項では、当事者間で合意できる事項と、取得・通知・立証・行政機関や専門家への確認が必要な事項を分けます。担当者、範囲、期限、証拠の保存方法を記録し、後で内容を追跡できるようにします。

署名・送付前の確認

日本では、解体範囲、工程、許可・届出、安全、廃棄物、引渡しを具体的な事実、日付、添付資料で記載します。建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件は確認の出発点であり、すべての事案で自動的に結論を決めるものではありません。第8項では、当事者間で合意できる事項と、取得・通知・立証・行政機関や専門家への確認が必要な事項を分けます。担当者、範囲、期限、証拠の保存方法を記録し、後で内容を追跡できるようにします。

日本では、解体範囲、工程、許可・届出、安全、廃棄物、引渡しを具体的な事実、日付、添付資料で記載します。建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件は確認の出発点であり、すべての事案で自動的に結論を決めるものではありません。第9項では、当事者間で合意できる事項と、取得・通知・立証・行政機関や専門家への確認が必要な事項を分けます。担当者、範囲、期限、証拠の保存方法を記録し、後で内容を追跡できるようにします。

条項ごとの確認ガイド

第1項
この項目は解体範囲、工程、許可・届出、安全、廃棄物、引渡しを明確にします。事実、添付資料、発効日、責任者を確認してください。署名だけでは、許可、届出、説明義務、専門家による確認に代わりません。
第2項
この項目は解体範囲、工程、許可・届出、安全、廃棄物、引渡しを明確にします。事実、添付資料、発効日、責任者を確認してください。署名だけでは、許可、届出、説明義務、専門家による確認に代わりません。
第3項
この項目は解体範囲、工程、許可・届出、安全、廃棄物、引渡しを明確にします。事実、添付資料、発効日、責任者を確認してください。署名だけでは、許可、届出、説明義務、専門家による確認に代わりません。
第4項
この項目は解体範囲、工程、許可・届出、安全、廃棄物、引渡しを明確にします。事実、添付資料、発効日、責任者を確認してください。署名だけでは、許可、届出、説明義務、専門家による確認に代わりません。
第5項
この項目は解体範囲、工程、許可・届出、安全、廃棄物、引渡しを明確にします。事実、添付資料、発効日、責任者を確認してください。署名だけでは、許可、届出、説明義務、専門家による確認に代わりません。
第6項
この項目は解体範囲、工程、許可・届出、安全、廃棄物、引渡しを明確にします。事実、添付資料、発効日、責任者を確認してください。署名だけでは、許可、届出、説明義務、専門家による確認に代わりません。
第7項
この項目は解体範囲、工程、許可・届出、安全、廃棄物、引渡しを明確にします。事実、添付資料、発効日、責任者を確認してください。署名だけでは、許可、届出、説明義務、専門家による確認に代わりません。
第8項
この項目は解体範囲、工程、許可・届出、安全、廃棄物、引渡しを明確にします。事実、添付資料、発効日、責任者を確認してください。署名だけでは、許可、届出、説明義務、専門家による確認に代わりません。

建物解体工事契約書 — コンプライアンス確認事項

実務上の確認項目であり、法的助言ではありません。

  • 当事者と立場を明記する

    建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件を踏まえて確認し、確認結果の資料を保存します。

    e-Gov法令検索・個人情報保護委員会・国土交通省等
  • 対象と制限を具体化する

    建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件を踏まえて確認し、確認結果の資料を保存します。

  • 添付資料と版を紐づける

    建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件を踏まえて確認し、確認結果の資料を保存します。

  • 金額、税、支払期日を確認する

    建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件を踏まえて確認し、確認結果の資料を保存します。

  • 期限、受領、証拠を定める

    建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件を踏まえて確認し、確認結果の資料を保存します。

  • 個人情報とアクセスを最小限にする

    建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件を踏まえて確認し、確認結果の資料を保存します。

  • 許可、届出、業界要件を確認する

    建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件を踏まえて確認し、確認結果の資料を保存します。

  • 高リスクなら専門家に確認する

    建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件を踏まえて確認し、確認結果の資料を保存します。

テンプレートの使い方

  1. 事実を集める. 解体範囲、工程、許可・届出、安全、廃棄物、引渡しを裏付けるデータ、添付資料、金額を集めます。
  2. 当事者を確認する. 本人確認、立場、権限、連絡先を確認します。
  3. 資料を添付する. 見積書、請求書、仕様、写真、メッセージ、適用条件に番号を付けます。
  4. 期限を確認する. 開始、検査、請求、承認、許可、保存の各日付を確認します。
  5. 送付前に見直す. 金額、支払、個人情報、宛先、許可や届出を確認し、高リスクなら専門家に相談します。

よくある質問

このテンプレートを変更せず使えますか?

建物解体工事契約書を日本で使う場合、答えは事実、添付資料、消費者との関係、建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件によって異なります。準備資料として使い、現行ルールを確認し、送付または合意の証拠を保存してください。

どの添付資料が重要ですか?

建物解体工事契約書を日本で使う場合、答えは事実、添付資料、消費者との関係、建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件によって異なります。準備資料として使い、現行ルールを確認し、送付または合意の証拠を保存してください。

どの日付を記載しますか?

建物解体工事契約書を日本で使う場合、答えは事実、添付資料、消費者との関係、建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件によって異なります。準備資料として使い、現行ルールを確認し、送付または合意の証拠を保存してください。

許可や届出は必要ですか?

建物解体工事契約書を日本で使う場合、答えは事実、添付資料、消費者との関係、建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件によって異なります。準備資料として使い、現行ルールを確認し、送付または合意の証拠を保存してください。

消費者にも使えますか?

建物解体工事契約書を日本で使う場合、答えは事実、添付資料、消費者との関係、建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件によって異なります。準備資料として使い、現行ルールを確認し、送付または合意の証拠を保存してください。

専門家に相談すべき時はいつですか?

建物解体工事契約書を日本で使う場合、答えは事実、添付資料、消費者との関係、建築基準法、国土交通省の解体関係資料、自治体の届出・許可要件によって異なります。準備資料として使い、現行ルールを確認し、送付または合意の証拠を保存してください。

関連するテンプレート

免責事項

このテンプレートと説明は日本向けの一般情報であり、法務、税務、医療、保険、マーケティング、プライバシーに関する助言ではありません。弁護士、行政機関、その他の権限ある専門家があなたの事情を審査・承認したものではありません。国や自治体の現行ルール、許可・届出、業界要件を確認し、リスクが高い場合は専門家に相談してください。