Proof of Delivery (Delivery Acknowledgement) Form Template (US)

Updated on October 2, 2026

A proof of delivery form — often called a delivery acknowledgement — is the single-page record a recipient signs to confirm that goods arrived, in what quantity, and in what condition. It is not a sales document and it carries no prices. Its entire job is evidential: six months later, when the buyer says four cartons were missing and the carrier says everything was handed over, this is the piece of paper that decides the argument.

Most free delivery acknowledgement forms fail at exactly that job. The widely cloned Jotform version is a derelict user-submitted page that still serves a real third party’s branded document, complete with that company’s logo, a named recipient and a rendered signature. Its one substantive sentence contains three spelling errors, and it asks the signer to confirm the goods "was found to be in good condition" before giving them anywhere to record that they were not. This template is built the other way round: it assumes something will occasionally be wrong, and gives the recipient a structured way to say so at the moment it matters.

2 of 21 blanks filled

Tap any highlighted blank in the document below and type straight into it.Free — no sign-up, no watermark

Choose your version

Proof of Delivery — Delivery Acknowledgement

This form records the handover of goods. It is not a contract of carriage, not a document of title and not an invoice.

1. Parties and references

Supplier:
Supplier contact:
Recipient:
Recipient role:
Recipient company:
Order number:
Delivery note number:
Tracking reference:
OptionalInclude carrier and vehicle detailsTurn off for deliveries made by the supplier’s own staff.
Carrier or driver:
Vehicle or route:

2. Delivery

Delivery address:
Date of delivery:
Time of delivery:
Packages expected:
Packages received:

3. Items delivered

4. Outcome

The recipient confirms that the packages described above were received in full and that no damage or shortage was visible at the point of handover.

5. Reservation of the right to inspect

Signing this form confirms receipt of the packages described and their condition as visible at the point of handover. It is not an inspection of the contents and is not an acceptance of the goods as conforming to the order. The recipient reserves the right to inspect the contents and to notify the supplier of any shortage, damage or non-conformity within days of delivery, or within any longer period allowed by the contract between the parties or by law.

6. Signature at handover

Received by

Date and time:

Delivered by

Date and time:

OptionalInclude the later contents-check section

7. Contents check (completed after opening)

Contents checked on:
Result:
Supplier notified on:
OptionalInclude the photograph and data-retention noteTurn on if your driver app captures an image or location stamp.

What a signature on a delivery form actually does

A great many people sign delivery paperwork believing it is a formality, and a great many businesses treat the signature as a complete release. Neither is right. Under the Uniform Commercial Code as adopted in most states, a buyer has a right before payment or acceptance to inspect goods "at any reasonable place and time and in any reasonable manner", and where the seller is required to ship, inspection may take place after arrival. A signature taken on a doorstep in thirty seconds is not an inspection, and this form says so on its face.

What the signature does do is create a dated record that the goods were tendered and received. That matters more than most people realise, because the buyer who later wants a remedy has a notice duty: the Uniform Commercial Code provides that a buyer who has accepted goods must, within a reasonable time after discovering or when the buyer should have discovered a breach, notify the seller, "or be barred from any remedy". A proof of delivery form that records the date, the items and any visible problem starts that clock on terms you can evidence.

The template therefore carries an express reservation: the recipient acknowledges receipt of the packages described, confirms any damage or shortage visible on arrival, and reserves the right to inspect the contents and notify the supplier of any further non-conformity within a stated number of days. That one sentence is the biggest practical difference between this form and the free versions.

Count packages, then count contents — they are different events

The commonest dispute in delivery paperwork is a muddle between two separate facts: how many packages arrived, and whether what was inside them was right. A driver can only ever evidence the first. A recipient standing at a loading bay can usually count cartons and see crushed corners, but cannot open and check thirty boxes while a van waits.

This form splits the two. The signature block records packages received, visible condition and any refused items at the point of handover. A separate contents-check section, completed later, records whether the goods inside matched the order and when the supplier was told if they did not. Keeping them apart means a signature is never later presented as proof of something the signer could not have known.

Short delivery, damage and refusal need boxes, not a blank margin

A form that offers only "everything delivered: yes" invites people to tick yes because there is nowhere else to go. This template gives the recipient four explicit outcomes — accepted in full, accepted with damage noted, accepted short, or refused — and records the quantity received against the quantity expected for every line. If a line is short, the shortfall is on the document, not in somebody’s memory.

Refusal deserves particular care. A recipient who refuses a delivery outright should say why on the spot, because a refusal with no stated reason is the kind of fact that gets re-characterised later. The form prompts for the reason, who authorised the refusal, and whether the goods went back on the vehicle.

This is not a bill of lading, and it is not a delivery receipt

Three documents get confused constantly. A bill of lading is the carriage contract between a shipper and a carrier, and in its negotiable form it is a document of title to the goods. A delivery receipt is the itemised, priced document a supplier issues to the customer, usually carrying tax detail. A proof of delivery form is neither: it is a short evidential record signed at the point of handover, and it typically shows no prices at all.

Use the right one. If you are contracting with a carrier for the movement of freight, you need a bill of lading. If you are giving a customer a priced record of what was delivered and what it cost, you need a delivery receipt. If all you want is a signature proving the goods changed hands and in what state, this is the document.

Photographs, timestamps and the personal data problem

Driver apps now routinely capture a photograph of the goods at the door and a GPS timestamp. Those are good evidence, but they are also records about identifiable people — the recipient, sometimes a neighbour, sometimes the inside of someone’s home. If you capture them, say so on the form, say how long you keep them and who can see them, and do not retain them longer than you need. The template includes an optional capture-and-retention line for exactly that purpose.

The same restraint applies to the paper form. A proof of delivery needs the recipient’s name and signature. It does not need their date of birth, their ID number or their phone number copied onto a slip that will be photographed and filed by several people.

What each section of the delivery acknowledgement does

Supplier, carrier and recipient identification
Names all three parties, not just two. A dispute about a missing carton usually involves a carrier who is not the supplier, and a form that omits them is useless for recovery.
Order, delivery note and tracking references
Ties the acknowledgement to the paperwork it evidences, so the record can be matched to the order and the consignment months later.
Delivery address, date and time
Records where and precisely when the handover happened. Time is routinely omitted from free forms and routinely decisive in disputes about failed or late delivery.
Package count and item-level quantities
Separates packages received from units received, and records expected against actual for every line so a shortfall is quantified rather than described.
Condition on arrival and damage noting
Gives the recipient a place to record visible damage, wet or crushed packaging, broken seals and temperature excursions at the moment of handover.
Delivery outcome
Forces one of four explicit outcomes — accepted in full, accepted with damage, accepted short, or refused — instead of a single yes/no tick.
Refusal reason and authority
Where goods are refused, records why, who authorised it and whether the goods were returned on the vehicle.
Reservation of the right to inspect
States that signing confirms receipt of the packages described and visible condition only, and preserves the right to inspect contents and notify the supplier within the stated period.
Contents check and notification record
A second, later section recording whether contents matched, what was wrong and the date the supplier was notified — the fact that preserves a remedy.
Recipient name, role and signature
Captures who signed and in what capacity. "Received by: Dave" is not evidence that anyone with authority accepted anything.
Photograph and data-retention note
Optional. Discloses that an image or location stamp was captured, who holds it and for how long.

US proof of delivery checklist

Points to settle before you put this form into service across a delivery operation. Article 2 of the Uniform Commercial Code is adopted state by state with variations — check your state’s version and your own contract terms, which can change the default position.

  • Do not ask a signer to confirm more than they can know

    Article 2 of the Uniform Commercial Code gives a buyer the right, before payment or acceptance, to inspect goods at any reasonable place and time and in any reasonable manner. A doorstep signature is not an inspection, and a form that presents it as one is likely to be read against the party that drafted it.

    UCC § 2-513 (buyer’s right to inspection of goods)
  • Give recipients a route to notify problems, and record the date

    A buyer who has accepted goods must notify the seller of a breach within a reasonable time after discovering it, or be barred from any remedy. Build the notification date into the form rather than leaving it to email.

    UCC § 2-607(3)(a) (notice of breach after acceptance)
  • Decide what your own terms say about inspection periods

    Parties can and routinely do agree a shorter inspection and claims window than the statutory default. Make the number on this form match the number in your terms of sale or supply, or you will have two inconsistent deadlines in play.

  • Use a bill of lading for the carriage leg

    A proof of delivery form does not create or evidence a contract of carriage and is not a document of title. If you are tendering freight to a carrier, issue a bill of lading as well.

  • Keep the personal data on the form to a minimum

    A delivery acknowledgement needs a name, a role and a signature. Collecting identification numbers, dates of birth or phone numbers on a slip that is photographed and circulated creates risk with no evidential benefit.

  • Disclose photographic and location capture

    If your driver app photographs the delivery or records a GPS position, say so on the form, say who holds the image and for how long, and apply a deletion schedule.

  • Make the signature capture match your e-signature practice

    The federal E-SIGN Act gives electronic signatures and records legal effect in interstate commerce, subject to its conditions. If you capture signatures on a handheld device, keep the associated record — who signed, when and on what device.

    15 U.S.C. § 7001 (E-SIGN Act)
  • Check sector rules before adapting this form

    Controlled substances, alcohol, firearms, hazardous materials, medical devices and temperature-controlled pharmaceuticals all carry their own delivery documentation and chain-of-custody requirements that this general form does not meet.

How to complete the proof of delivery form

  1. Fill in the references before the vehicle arrives. Enter the supplier, carrier, order number, delivery note number and tracking reference in advance so the driver and recipient only have to deal with what actually happens at the door.
  2. Count packages and record visible condition. Record packages expected and packages received, then note any crushed, wet, opened or re-taped cartons, broken seals or temperature excursions before signing anything.
  3. Choose the delivery outcome. Select accepted in full, accepted with damage noted, accepted short, or refused. If anything is short or refused, complete the quantity and reason fields rather than writing in the margin.
  4. Sign with a name and a role. The recipient prints a name, states their role or authority to receive, and signs. Record the exact time of delivery, not just the date.
  5. Complete the contents check afterwards. When the packages are opened, record whether the contents matched, what was wrong, and the date you notified the supplier. Keep this with the signed slip.
  6. Download and file both copies. Export to PDF or DOCX, give one copy to the recipient and keep one with the order. A proof of delivery that only one side holds is half an evidence trail.

Proof of delivery form — frequently asked questions

What is the difference between a proof of delivery and a delivery note?

A delivery note is issued by the supplier and travels with the goods, listing what was sent. A proof of delivery is signed by the recipient and records what actually arrived, in what condition, and when. One is a statement of intent, the other is evidence of an event. In practice many businesses print them as two halves of the same sheet, which is fine as long as the recipient is signing only the second half.

Does signing a delivery acknowledgement mean I accept the goods?

Not automatically, and this template says so expressly. Signing confirms that the packages described arrived and records their visible condition. Under Article 2 of the Uniform Commercial Code a buyer has a right to inspect goods before acceptance, and acceptance generally requires a reasonable opportunity to inspect. The practical risk is not the signature itself — it is signing a form that is worded as a confirmation that everything was inspected and found correct.

What should I do if I cannot check the goods before the driver leaves?

Record what you can verify — package count and visible condition — select "accepted with damage noted" or "accepted in full" as appropriate for the packaging only, and write "contents not inspected" in the condition field. Then complete the contents-check section as soon as you open the delivery and notify the supplier in writing if anything is wrong. The notification date is the part that protects you.

How long do I have to report a shortage or damage?

Your contract usually sets the period, and that is the number to work to. Where the contract is silent, the statutory position under the Uniform Commercial Code is that a buyer who has accepted goods must notify the seller within a reasonable time after discovering the breach or be barred from a remedy — "reasonable" depends on the goods and the circumstances. Do not rely on it. Put a concrete number in your terms and on this form.

Can I refuse part of a delivery?

Commonly yes, and the form has a field for it. Record which lines were refused, how many units, the reason, who authorised the refusal and whether the goods went back on the vehicle. Partial refusal is much easier to defend when it is documented at the point of handover with a reason than when it is asserted in an email a week later.

Is an electronic signature on a handheld device good enough?

Generally yes for ordinary commercial deliveries. The federal E-SIGN Act gives electronic signatures and records legal effect in interstate commerce, and most states have adopted a version of the Uniform Electronic Transactions Act. What matters evidentially is the surrounding record: the name, the time, the device and the fact that the signer was given the chance to add a condition note before signing.

Do I need a proof of delivery if I already have a bill of lading?

They do different jobs. A bill of lading governs the carriage and, in negotiable form, title to the goods. A proof of delivery records the handover at the destination and the condition of the goods at that moment. Freight operations usually generate both, and the delivery receipt portion of a bill of lading is not always detailed enough to resolve a line-level shortage.

Should the driver keep a copy?

Yes. The most common reason a delivery dispute cannot be resolved is that only one party kept the signed slip. Issue two copies — or export the completed PDF twice — and make sure any damage note appears on both. A condition note written on the recipient’s copy only is worth very little.

Related templates

Disclaimer

This template and guide are general information only, not legal, tax, insurance, employment, consumer-credit, construction, dental or intellectual-property advice. No attorney has reviewed your facts, and nothing here is certified as compliant with any law. Federal, state and local rules differ and change — check the current rules for your situation, and take professional advice before you sign or send.