Demolition Contract Template (US)

Updated on October 2, 2026

A demolition contract allocates the work, the money, the risk and — more than in almost any other construction document — the regulatory duties. Demolition is the one trade where the sequence of events before the first machine arrives is itself legally prescribed: survey, notify, disconnect, then demolish. A contract that treats those steps as background detail has missed the main event.

The Jotform demolition contract is one of the better-drafted documents in its library. It has a real scope section, a payment table, change orders, insurance, indemnities and a sensible termination clause. What it does not have is the regulatory spine. It treats asbestos purely as something that might be discovered mid-job, says nothing about the survey that must happen before work starts, nothing about notifying the regulator, nothing about locating underground utilities, and nothing about who owns the scrap. It also still carries an unreplaced "[Number] days" placeholder in its termination clause. This template keeps the structure and adds what demolition actually requires.

4 of 36 blanks filled

Tap any highlighted blank in the document below and type straight into it.Free — no sign-up, no watermark

Choose your version

Demolition Contract

This Demolition Contract is made on between of (the "Contractor"), holding state licence or registration number , and of (the "Owner").

1. Property and structures

Property address:
Legal description:
Structures to be demolished:

The Owner warrants that it has lawful authority to authorise the demolition of the structures described, that it has disclosed to the Contractor all hazardous conditions, buried structures, tanks and services of which it is aware, and that no third party has an interest in the structures that would prevent their demolition.

2. Scope of work

The Contractor will demolish the structures described above, remove all resulting debris and waste from the site, and leave the site in the following condition: . The work will be performed in a good and workmanlike manner, in accordance with applicable law and the conditions of the demolition permit.

The following are expressly excluded from the scope and are not included in the Contract Price: . Any service not expressly included is excluded unless agreed by written change order.

3. Conditions precedent to mobilisation

The Contractor will not mobilise plant to the site, and demolition will not begin, until each of the following has been completed and evidence has been provided to the other party:

  • a thorough inspection of the affected facility for the presence of asbestos, including Category I and Category II non-friable asbestos-containing material, commissioned by with the report provided by ;
  • the written regulatory notification required for the demolition, filed by by , which must be postmarked or delivered at least ten working days before any activity that would disturb asbestos-containing material and, for a demolition, whether or not asbestos is found;
  • the demolition permit, obtained by , with a copy provided to the other party;
  • an engineering survey of the structures and of any adjacent structure where workers may be exposed, made by a competent person — — covering the condition of the framing, floors and walls and the possibility of unplanned collapse, with the written record retained and available on request;
  • confirmation that all service lines have been shut off, capped or otherwise controlled outside the building line, with the relevant utility companies notified in advance;
  • an underground facility locate request submitted at least working days before any excavation, with the ticket number recorded in the site file.

If an unmarked underground facility is encountered, the Contractor will stop work in that area immediately, notify the facility owner and the Owner, and not resume until the position has been resolved.

4. Hazardous materials found despite the survey

If asbestos, lead-based paint, mercury-containing devices, PCB-containing equipment, refrigerants, an underground storage tank or any other regulated material is encountered that was not identified in the survey, the Contractor will stop work in the affected area, secure it, and notify the Owner immediately. The additional work will be priced and agreed by written change order before it proceeds. The cost is borne by the Owner, except to the extent the material should reasonably have been identified by a survey for which the Contractor was responsible.

5. Salvage and scrap

All salvage, scrap and materials arising from the demolition become the property of the Contractor on removal from the structure, and the Contract Price has been set on that basis.

6. Waste handling and documentation

The Contractor will transport and dispose of all waste only at facilities permitted to receive it, will handle each regulated waste stream in accordance with the requirements applying to it, and will deliver to the Owner copies of all manifests, weight tickets and certificates of disposal within fourteen days of completion.

OptionalSet a waste diversion target

7. Site controls and the neighbours

Work will be carried out only during . The Contractor will implement dust suppression, manage water used for suppression so that it does not discharge unlawfully from the site, and take reasonable measures to limit noise and disturbance to neighbouring occupiers.

OptionalInclude a pre-condition survey of adjoining properties

Before mobilisation the Contractor will carry out a photographic pre-condition survey of the adjoining properties, boundaries, walls, driveways and highways likely to be affected, and will provide a copy to the Owner. The survey is evidence of the condition of those features before the work began.

OptionalInclude vibration monitoring
OptionalInclude site security and hoarding

The Contractor will secure the site with fencing or hoarding and appropriate warning signage, will keep the site secure outside working hours, and is responsible for preventing unauthorised access for the duration of the work.

OptionalInclude pest and rodent treatmentSeveral municipalities require this as a demolition permit condition.

8. Insurance

Before mobilisation and throughout the work, the Contractor will maintain at its own expense:

  • commercial general liability insurance of not less than ;
  • commercial automobile liability insurance of not less than ;
  • workers’ compensation and employer’s liability insurance as required by the law of the state in which the work is performed;
  • contractor’s pollution liability insurance of not less than , general liability policies commonly excluding pollution.

The Owner will be named as an additional insured on the liability policies, the policies will include a waiver of subrogation in favour of the Owner and will be primary and non-contributory. Certificates of insurance will be provided by and on each renewal, and the Contractor will give the Owner written notice of cancellation, non-renewal or material change.

OptionalRequire payment and performance bonds

9. Contract price and payment

The Contract Price is . Payment is made as follows: . Each payment is due within days of a valid invoice. Overdue amounts may bear interest at % per month or the maximum rate permitted by applicable law, whichever is lower.

OptionalWithhold retainage

The Owner will withhold retainage of % from each progress payment. Retainage is released on substantial completion of the work, delivery of the waste documentation and receipt of the unconditional lien waivers, subject to any limit or release timetable imposed by applicable state law.

OptionalRequire lien waivers with each payment

With each progress payment the Contractor will deliver conditional waivers and releases of lien from itself and from each subcontractor and supplier for the amount covered by that payment, and on final payment will deliver unconditional waivers and releases from all of them.

10. Schedule

Work will commence on or about , subject to the conditions precedent being satisfied, and is to be substantially complete by . The completion date is extended by delay caused by weather, concealed or unforeseen site conditions, governmental action, late permit issue, labour disputes or other events beyond the Contractor’s reasonable control, with the Contractor notifying the Owner promptly of any such delay.

11. Change orders

No change to the scope, the Contract Price or the schedule takes effect unless recorded in a written change order signed by both parties, stating the change, the price adjustment and the schedule impact. Verbal instructions do not vary this contract and the Contractor is not obliged to act on them.

12. Indemnity and limitation of liability

Each party will indemnify the other against claims, damages, losses and reasonable costs arising from its own negligent acts or omissions, breach of this contract or breach of applicable law. The Owner will additionally indemnify the Contractor against claims arising from hazardous conditions the Owner knew of and did not disclose.

Except for liability arising from fraud, wilful misconduct, bodily injury, death, or any liability that cannot lawfully be limited, each party’s total liability under this contract is limited to , and neither party is liable to the other for indirect, incidental, special or consequential damages, including loss of profit, loss of rent and loss of use.

13. Termination

Either party may terminate on written notice if the other materially breaches this contract and fails to remedy the breach within days of written notice. The Owner may terminate for convenience on written notice, in which case the Contractor is entitled to payment for work properly performed to the termination date together with reasonable demobilisation costs.

On termination for any reason the Contractor will immediately cease operations, leave the site in a safe and secure condition with any partially demolished structure made stable, remove its plant, and submit a final invoice for amounts properly due.

14. General

  • Amendment: only by a written document signed by both parties.
  • Assignment: neither party may assign without the other’s written consent, except to a successor in a sale of the business or the property that assumes these obligations.
  • Entire agreement: this contract, the scope documents and any signed change orders are the whole agreement on their subject matter.
  • Severability: if any provision is invalid or unenforceable the rest continues in force.
  • Notices: in writing, delivered by hand, recognised courier, certified mail or email with confirmation of receipt, to the addresses above.
  • Counterparts and electronic signature: this contract may be signed in counterparts and electronically.

15. Governing law and disputes

This contract is governed by the laws of the State of . The parties will first attempt to resolve any dispute by good-faith negotiation between senior representatives, and failing that will submit it to the courts or forum at .

Contractor

Date signed:

Property Owner

Date signed:

Asbestos: the sequence is survey, notify, then demolish

The federal asbestos NESHAP requires the owner or operator to thoroughly inspect the affected facility for the presence of asbestos before demolition or renovation begins, including Category I and Category II non-friable asbestos-containing material. That inspection is not conditional on anyone suspecting asbestos is present — it is the starting point.

Written notification follows. The rule requires the notice to be postmarked or delivered at least ten working days before asbestos stripping or removal work, or any other activity that would break up, dislodge or similarly disturb asbestos material, begins. For demolitions the ten-working-day notice applies even where no asbestos is found. There are narrower provisions for emergencies and for structures ordered demolished because they are structurally unsound, where notification must be as early as possible and no later than the following working day.

The practical consequence for the contract is that "if hazardous materials are discovered, Contractor shall notify Owner" — the Jotform position — describes the wrong moment. This template puts the survey and the notification into the critical path: it names who commissions the survey, requires the survey report to be provided before mobilisation, names who files the notification and by when, and makes the start date conditional on both. It also keeps a discovery clause for material found despite the survey, because that happens.

The engineering survey and the structures next door

Federal construction safety rules require that, before demolition operations begin, an engineering survey of the structure be made by a competent person, covering the condition of the framing, floors and walls and the possibility of unplanned collapse of any portion of the structure. Where workers may be exposed, adjacent structures must be similarly checked, and the employer must keep written evidence that the survey was done.

The same body of rules requires that all service lines — electric, gas, water, steam, sewer and others — be shut off, capped or otherwise controlled outside the building line before demolition starts, with notification to the relevant utility companies in advance.

The template therefore makes the engineering survey a precondition to mobilisation, names the competent person, requires the written record to be kept and produced on request, and makes utility disconnection a documented step with evidence rather than a sentence of intent. It also adds the pre-condition survey of adjoining properties, which is a commercial protection rather than a legal duty: photograph the neighbours’ walls and driveways before you start, and the inevitable claim about a pre-existing crack becomes manageable.

Call before you dig, and say so in the contract

Demolition almost always involves excavation — foundations, slabs, buried tanks, service runs. Every state operates an underground facility notification system reached through the national 811 number, and in most states contacting it before excavating is a statutory requirement with defined notice periods and marking validity.

The Jotform document does not mention it. This template makes the locate request a named obligation with a stated lead time, requires the ticket number to be recorded, requires work to stop and the facility owner to be notified if an unmarked line is found, and allocates the cost and delay consequences of a strike. It is a short clause that prevents an expensive and dangerous category of incident.

Who owns the scrap?

Salvage is a material economic term in demolition and it is missing from almost every free template. Structural steel, copper, brick, architectural features, mechanical plant and fixtures can be worth a significant proportion of the contract value, and a demolition price is often quoted on the assumption that the contractor keeps them.

If the contract is silent, the parties have two different assumptions and no way to resolve them. This template requires an explicit choice: salvage passes to the contractor, salvage remains the owner’s, or specified items are reserved to the owner and the rest passes. Where the owner reserves items, the contract requires them to be listed, and makes the contractor responsible for careful removal and the owner responsible for collecting them within a stated period.

Waste, dust, noise and the neighbours

Demolition generates construction and demolition debris, and increasingly it generates reporting obligations: many municipalities require a waste management plan, a minimum diversion or recycling rate, and evidence of lawful disposal. Regulated waste streams — asbestos, lead paint, mercury-containing devices, PCB-containing light ballasts, refrigerants, underground storage tanks — each have their own handling and documentation requirements.

The template therefore requires disposal only at permitted facilities, requires manifests, weight tickets and certificates of disposal to be delivered to the owner, and carries an optional diversion target. It also adds the nuisance controls the source document does not have: dust suppression, water use and discharge, permitted working hours, noise limits and vibration monitoring where adjoining structures are sensitive, site security and hoarding, and pest treatment, which several municipalities require as a condition of a demolition permit.

Insurance with numbers, liens, retainage and bonds

The source document lists three types of insurance and requires certificates "upon request". That is not an insurance clause. This template requires each cover with a stated limit, requires the owner to be named as an additional insured on the liability policies where appropriate, requires a waiver of subrogation and primary and non-contributory wording, requires certificates before mobilisation and on renewal, and requires notice of cancellation. It also prompts for pollution liability cover, which general liability policies commonly exclude and which is directly relevant to demolition.

Three further commercial protections are absent from the source and included here as options. Retainage: a percentage withheld from each payment until completion. Lien machinery: in most states a contractor, subcontractor or supplier can assert a lien against the property for unpaid work, and the owner’s protection is conditional lien waivers exchanged for each progress payment and an unconditional waiver on final payment. And bonds: payment and performance bonds, which are usually required on public work and are worth considering on larger private demolitions.

If the owner is a homeowner, extra rules apply

Residential demolition for a consumer is a different regulatory animal from commercial work. Most states regulate home improvement contracts directly: licensing and registration, mandatory written terms, limits on the deposit that may be taken before work starts, and a cancellation right where the contract was signed away from the contractor’s place of business. Several states require specific notices in specified type sizes, and non-compliance can make the contract unenforceable by the contractor.

This template includes an optional residential block that prompts for the licence number, the cancellation notice and the deposit limit, but the content of those requirements is state law and you must check your own state before using it on a consumer job.

Demolition contract clause guide

Parties, licence and entity details
Names both parties, the contractor’s state licence or registration number and its classification. Absent from the source.
Property and structures to be demolished
Address, legal description, and an itemised list of the structures in scope with anything expressly excluded.
Owner authority and title warranty
The owner warrants it has lawful authority to authorise the demolition and has disclosed known hazardous conditions.
Scope of work and exclusions
What is demolished, what is removed, what is left, the final site condition, backfill and grade — and an express list of what is not included.
Pre-demolition surveys as conditions precedent
The asbestos inspection and the engineering survey by a competent person, both completed and provided before mobilisation rather than treated as background.
Regulatory notifications
Who files the asbestos notification and by when, who obtains the demolition permit, and the evidence to be given to the other party.
Utility disconnection and underground locate
Service lines shut off, capped or controlled outside the building line with documented evidence, and an 811 locate request with the ticket number recorded.
Hazardous materials found despite the survey
Stop work, notify, price by change order, and who bears the cost — rather than the source’s open-ended "addressed by written amendment".
Salvage and scrap ownership
An explicit choice: contractor keeps salvage, owner keeps salvage, or listed items reserved to the owner.
Waste handling, manifests and diversion
Permitted facilities only, manifests and weight tickets delivered to the owner, regulated streams handled separately, optional diversion target.
Dust, noise, vibration and neighbours
Dust suppression and water management, permitted working hours, noise limits, vibration monitoring and a pre-condition survey of adjoining properties.
Site security, hoarding and pest control
Fencing and signage, out-of-hours security, and rodent treatment where the permit or the municipality requires it.
Insurance with stated limits
Each cover named with a number, additional insured status, waiver of subrogation, primary and non-contributory wording, certificates before mobilisation and notice of cancellation.
Contract price, schedule of values and retainage
Lump sum or unit rates, a payment schedule tied to milestones, and an optional retainage percentage released on completion.
Lien waivers
Conditional waivers from the contractor and its subcontractors and suppliers with each progress payment, and an unconditional waiver on final payment.
Bonds
Optional payment and performance bonds, with the penal sum stated.
Change orders
Written, signed, priced, and with any schedule impact stated before the work proceeds.
Delay, weather and unforeseen conditions
What extends the schedule, what is compensable and what is not.
Indemnity, limitation of liability and consequential loss
Mutual indemnity tied to fault, a cap with carve-outs, and a mutual waiver of consequential damages — all absent from the source.
Termination and the state of the site on termination
Cause and convenience, with a real number rather than a placeholder, and an obligation to leave the site safe and secure.
Residential consumer provisions
Optional. Licence disclosure, cancellation right and deposit limit where the owner is a homeowner — content set by state law.

US demolition contract compliance checklist

Demolition is regulated federally, by state and by municipality, and permits are usually issued locally with their own conditions. Work through this with your contractor before mobilisation, not afterwards.

  • Inspect for asbestos before demolition — always

    The asbestos NESHAP requires the owner or operator to thoroughly inspect the affected facility for asbestos, including Category I and Category II non-friable material, before demolition or renovation begins. It is not triggered by suspicion; it is the first step.

    40 CFR § 61.145 (asbestos NESHAP — standard for demolition and renovation)
  • File the written notification at least ten working days ahead

    The notice must be postmarked or delivered at least ten working days before asbestos stripping or removal, or any other activity that would disturb asbestos material, begins — and for demolitions the notification requirement applies even where no asbestos is found. Emergency and ordered-demolition situations have their own shorter route.

    40 CFR § 61.145(b) (notification requirements)
  • Get the engineering survey done by a competent person

    Before demolition begins, an engineering survey must be made by a competent person covering the condition of the framing, floors and walls and the possibility of unplanned collapse, extending to adjacent structures where employees may be exposed. Written evidence of the survey must be kept.

    29 CFR § 1926.850(a) (preparatory operations)
  • Shut off and cap the services outside the building line

    All service lines must be shut off, capped or otherwise controlled outside the building line before demolition work starts, and the relevant utility companies must be notified in advance.

    29 CFR § 1926.850(c)
  • Request underground utility locates before excavating

    Call 811 or use your state’s online locate system before any excavation. Notice periods, the validity period of markings and tolerance zones are set by state law, and failing to request a locate is commonly an offence as well as a serious hazard.

    Common Ground Alliance / 811 — call before you dig
  • Check for lead paint where the structure is pre-1978 residential

    Lead-based paint in older housing brings its own worker-protection, notification and waste-handling requirements. Confirm the position before a residential demolition of an older property.

    EPA — lead renovation, repair and painting program
  • Identify the regulated waste streams before the first load leaves

    Asbestos waste, lead, mercury devices, PCB-containing ballasts, refrigerants and underground storage tanks each have handling and documentation requirements. Dispose only at permitted facilities and keep the manifests and weight tickets.

  • Require insurance with stated limits, not "upon request"

    Name each cover with a number, require additional insured status and a waiver of subrogation where appropriate, and obtain certificates before mobilisation. Ask specifically about pollution liability, which general liability policies commonly exclude.

  • Protect against liens with conditional and unconditional waivers

    In most states contractors, subcontractors and suppliers can assert a lien against the property for unpaid work. Exchange a conditional waiver for each progress payment and an unconditional waiver on final payment, and obtain them from subcontractors as well.

  • Check state home-improvement rules if the owner is a homeowner

    Residential work for a consumer commonly attracts licensing or registration requirements, mandatory written terms, deposit limits and a cancellation right, with specific notices in specified form. Non-compliance can make the contract unenforceable by the contractor.

How to complete the demolition contract

  1. Identify the property and the structures precisely. Address, legal description where you have one, and an itemised list of what comes down — plus an express list of what stays.
  2. Set the pre-start sequence and who does what. Name who commissions the asbestos survey, who files the notification, who obtains the permit, who arranges the engineering survey and who requests the utility locates, with dates for each.
  3. Decide salvage before you price the job. Choose whether the contractor keeps salvage, the owner keeps it, or specific items are reserved. If items are reserved, list them and set a collection deadline.
  4. Enter real insurance limits and bond requirements. Put numbers against each cover, set the date certificates are due, and turn on the bond clause if the job warrants it.
  5. Build the payment schedule with retainage and lien waivers. Tie payments to milestones, set the retainage percentage and release point, and require conditional waivers with each payment and an unconditional waiver at the end.
  6. Set the nuisance and neighbour controls. Working hours, dust suppression, vibration monitoring where relevant, the pre-condition survey of adjoining properties, and site security.
  7. Fill in every number before signing. Cure periods, notice periods, deadlines and limits. The widely copied free version ships with an unreplaced "[Number] days" in its termination clause — do not repeat that.

Demolition contract — frequently asked questions

Do I need an asbestos survey even if the building obviously has none?

The federal asbestos NESHAP requires the affected facility to be thoroughly inspected for asbestos before demolition or renovation begins, including non-friable categories. The duty is not conditional on suspicion. Written notification to the delegated agency is separately required ahead of a demolition — generally postmarked or delivered at least ten working days before work begins — even where the inspection finds nothing.

Who is responsible for pulling the permit, the owner or the contractor?

Either, but the contract must say which, because the permit conditions usually drive the programme. Most demolition contractors take the permit because they hold the licence and the municipality deals with them. Whoever takes it, the contract should require a copy to be given to the other party and should make the start date conditional on it being in hand.

Who owns the scrap metal and the salvaged materials?

Whoever the contract says. If the contract is silent you have a dispute waiting, because demolition prices are frequently quoted on the assumption the contractor keeps the salvage, and owners frequently assume the opposite. Decide it explicitly, and if you are reserving particular items — architectural features, specific plant — list them and set a deadline for collecting them.

What insurance should a demolition contractor carry?

Commercial general liability and commercial auto liability with stated limits, workers’ compensation as required by state law, and — the one that is commonly missed — pollution liability, because general liability policies frequently exclude pollution and demolition routinely disturbs regulated material. Ask for the owner to be named as an additional insured, with a waiver of subrogation, and get certificates before mobilisation.

What happens if asbestos or a buried tank turns up mid-job?

Work in the affected area stops, the contractor notifies the owner immediately, and the additional work is priced and agreed by written change order before it proceeds. The contract should say who bears the cost: typically the owner, unless the material should have been identified by a survey the contractor was responsible for, or the owner knew about it and did not disclose it. Leaving this to "a written amendment" with no cost rule, as the common free template does, is how these become disputes.

Do I need to call 811 before a demolition?

If any part of the work involves excavation — and foundations, slabs and buried services usually mean it does — then yes, and in most states it is a legal requirement with a defined notice period before you dig. Record the ticket number in the contract file, respect the tolerance zone around marked lines, and stop and notify the facility owner if you find an unmarked line.

Should I hold retainage on a demolition contract?

It is common and sensible on anything beyond a very small job. Withhold an agreed percentage of each progress payment and release it once the site has been left in the agreed condition, the final grade is right, the waste documentation has been delivered and the unconditional lien waivers are in hand. Several states regulate the maximum retainage and the release timetable, so check your state’s rule.

Is this template suitable for demolishing a house I live in?

Use it with care. Residential work for a consumer attracts home-improvement rules in most states: contractor licensing or registration, mandatory contract terms, limits on the deposit that can be taken before work begins, and a right to cancel in defined circumstances, often with notices in prescribed form. The template has an optional residential block to prompt for these, but the content is state law and you must check your own state.

Related templates

Disclaimer

This template and guide are general information only, not legal, tax, insurance, employment, consumer-credit, construction, dental or intellectual-property advice. No attorney has reviewed your facts, and nothing here is certified as compliant with any law. Federal, state and local rules differ and change — check the current rules for your situation, and take professional advice before you sign or send.