Demolition Contract Template (Malta)

Updated on 2 October 2026

A demolition contract allocates the work, the money, the risk and the regulatory duties. In Malta one subject dominates all the others: the protection of third party property. Buildings share party walls, sites are tight, and the regulatory framework governing construction and demolition has been built specifically around avoiding damage to the property next door.

A contract that does not engage with that framework — who the competent persons are, what the method statement and condition report must contain, who notifies the neighbours, what insurance is required — is not a Maltese demolition contract. The widely copied free template contains none of it.

4 of 36 blanks filled

Tap any highlighted blank in the document below and type straight into it.Free — no sign-up, no watermark

Choose your version

Demolition Contract

This Demolition Contract is made on between of (the "Contractor"), holding , and of (the "Owner").

1. Property and structures

Property address:
Title reference:
Structures to be demolished:

The Owner warrants that it has lawful authority to authorise the demolition of the structures described, that it has disclosed all hazardous conditions, buried structures, tanks and services of which it is aware, and that no third party holds an interest that would prevent their demolition.

2. Scope of work

The Contractor will demolish the structures described, remove all resulting waste from the site, and leave the site in the following condition: . The work will be carried out in a good and workmanlike manner and in accordance with applicable law and the conditions of any consent or permit.

The following are expressly excluded and are not included in the Contract Price: . Anything not expressly included is excluded unless agreed by written variation.

3. Conditions precedent to starting work

The Contractor will not mobilise plant to the site, and demolition will not begin, until each of the following has been completed and evidence provided to the other party:

  • an asbestos and hazardous materials survey of the structures, commissioned by , with the report provided by ;
  • confirmation that the Contractor is registered as required with the Building and Construction Authority for work of this class, and that any specialist work is carried out by appropriately licensed persons;
  • the planning permission or demolition approval the work requires, obtained by , together with any notification to the regulator filed by by ;
  • the documentation required by the rules governing the avoidance of damage to third party property, including a method statement, a condition report of adjoining property and the appointment of the competent persons those rules require;
  • a written demolition method statement and risk assessment prepared under the supervision of , addressing the proximity of adjoining buildings, the street and any public space;
  • confirmation that electricity, water, telecommunications and drainage have been disconnected and capped, with the providers notified at least working days in advance, and underground services located before any excavation.

4. Hazardous materials found despite the survey

If asbestos, lead paint, contaminated ground, a buried tank, refrigerant gases or any other hazardous or regulated material is encountered that was not identified in the survey, the Contractor will stop work in the affected area, secure it and notify the Owner immediately. The additional work will be priced and agreed by written variation before it proceeds. The cost is borne by the Owner, except to the extent the material should reasonably have been identified by a survey for which the Contractor was responsible.

5. Salvage and scrap

All salvage, scrap and arisings become the property of the Contractor on removal from the structure, and the Contract Price has been set on that basis.

6. Waste handling and documentation

The Contractor will transport and dispose of construction and demolition waste only through authorised carriers and only at permitted facilities, will manage asbestos and other hazardous waste streams separately under the applicable procedure, and will deliver copies of weighbridge dockets and disposal documentation to the Owner within fourteen days of completion. Given the limited local disposal capacity, the Contractor will confirm the disposal route before mobilisation rather than after the first load is loaded.

OptionalSet a waste diversion target

7. Site controls and neighbours

Work will be carried out only during . The Contractor will implement dust suppression, manage water used for suppression so that it does not discharge unlawfully from the site, and take reasonable measures to limit noise and disturbance to neighbouring occupiers.

OptionalInclude a pre-condition survey of adjoining properties

Before mobilisation the Contractor will carry out a photographic pre-condition survey of adjoining properties, boundaries, walls, driveways and highways likely to be affected, and provide a copy to the Owner.

OptionalInclude vibration monitoring
OptionalInclude site security and hoarding

The Contractor will secure the site with fencing or hoarding and appropriate signage, keep it secure outside working hours, and is responsible for preventing unauthorised access for the duration of the work.

OptionalInclude third party property protection provisionsMalta regulates the avoidance of damage to third party property during construction and demolition — keep this on for almost every site.

8. Insurance

Before mobilisation and throughout the work the Contractor will maintain at its own expense:

  • third party liability cover of not less than ;
  • employers’ liability cover of not less than , as required by law;
  • pollution or environmental liability cover of not less than , general liability policies commonly excluding pollution;
  • cover for damage to surrounding property and for the works themselves, appropriate to the value and location of the project.

Evidence of cover will be provided by and on each renewal, and the Contractor will notify the Owner in writing of cancellation, non-renewal or material change.

9. Contract price and payment

The Contract Price is . Payment is made as follows: . Each payment is due within days of a valid invoice. Overdue amounts carry interest on the following basis: .

OptionalWithhold retention

The Owner will withhold retention of % from each payment, released on completion of the work, delivery of the waste documentation and reinstatement of the site to the agreed condition.

10. Programme

Work will commence on or about , subject to the conditions precedent being satisfied, and is to be complete by . The completion date is extended by delay caused by weather, concealed or unforeseen site conditions, governmental or regulatory action, late consent, labour disputes or other events beyond the Contractor’s reasonable control, with prompt notice to the Owner.

11. Variations

No change to the scope, the Contract Price or the programme takes effect unless recorded in writing and signed by both parties, stating the change, the price adjustment and the programme impact. Verbal instructions do not vary this contract.

12. Indemnity and limitation of liability

Each party indemnifies the other against claims, damages, losses and reasonable costs arising from its own negligent acts or omissions, breach of this contract or breach of applicable law. The Owner additionally indemnifies the Contractor against claims arising from hazardous conditions the Owner knew of and did not disclose.

Except for fraud, wilful misconduct, death or personal injury caused by negligence, and any liability that cannot lawfully be limited, each party’s total liability under this contract is limited to , and neither party is liable for indirect or consequential loss including loss of profit, rent or use.

13. Termination

Either party may terminate on written notice if the other materially breaches this contract and fails to remedy within days of written notice. The Owner may terminate for convenience on written notice, in which case the Contractor is entitled to payment for work properly performed plus reasonable demobilisation costs. On termination for any reason the Contractor will cease operations, leave the site safe and secure with any partially demolished structure made stable, remove its plant and submit a final invoice.

14. General

  • Variation: only by a written document signed by both parties.
  • Assignment: neither party may assign without the other’s written consent, except to a successor that assumes these obligations.
  • Entire agreement: this contract, the scope documents and any signed variations are the whole agreement on their subject matter.
  • Severability: if any provision is invalid or unenforceable the rest continues in force.
  • Notices: in writing, by hand, courier, recorded delivery or email with confirmation of receipt.
  • Counterparts and electronic signature: this contract may be signed in counterparts and electronically.

15. Governing law and disputes

This contract is governed by the law of . The parties will first attempt to resolve any dispute by good-faith negotiation between senior representatives, and failing that will submit it to .

Contractor

Date signed:

Property Owner

Date signed:

Third party property protection is the centre of the document

Maltese law regulates the avoidance of damage to third party property during construction and demolition, with requirements covering the appointment of competent persons, the preparation and submission of a method statement, a condition report of the adjoining property, notification of adjoining owners and occupiers, and insurance.

This is not an optional protective step a careful owner adds; it is the regulatory spine of a demolition in a dense built environment. The template therefore makes those documents and appointments express conditions precedent to mobilisation, with named responsible parties and dates, rather than a general promise to comply with applicable law.

Confirm the current requirements with the Building and Construction Authority before you commit to a programme. The framework has been developed and amended in recent years and the detail matters — getting the competent person appointments or the condition report wrong can stop a site.

Registration, permits and the people who must be appointed

Contractors carrying out construction and demolition work in Malta are subject to registration requirements administered by the Building and Construction Authority, and specialist work must be carried out by appropriately licensed persons. Ask for the registration and check it covers the class of work.

Separately, demolition will usually require planning permission or a demolition approval from the planning authority, with heritage considerations where the structure or its setting is protected. Those are programme items and in a protected setting they are substantial ones.

The template records who obtains each approval, who makes each appointment and by when, and makes mobilisation conditional on the evidence being produced.

Waste: confirm the route before the first load

Construction and demolition waste volumes are large relative to local disposal capacity, and the route has to be confirmed before mobilisation rather than discovered afterwards. The template requires authorised carriers, permitted facilities, separate management of asbestos and other hazardous streams, and delivery of weighbridge dockets and disposal documentation to the owner within fourteen days of completion.

It also includes an optional diversion target, because reuse and recycling of inert demolition material is both commercially sensible and increasingly expected.

Salvage, insurance and the commercial terms

Salvage is a material economic term that free templates ignore. Decide explicitly whether the contractor keeps the arisings, the owner does, or listed items — stone, apertures, architectural features — are reserved with a collection deadline. In a market where traditional building materials have real value, this is worth settling before the price is agreed.

On insurance, require third party liability and employers’ liability with stated limits, pollution or environmental cover, and the insurance the third party property rules require. Require evidence before mobilisation and notice of cancellation. Add retention, a liability cap with carve-outs for fraud, wilful misconduct, death and personal injury, and a mutual exclusion of consequential loss — none of which the free template has.

Demolition contract clause guide

Parties, licence and registration details
Names both parties and records the contractor’s licence, registration or accreditation — absent from most free templates.
Property and structures in scope
Address, title reference, and an itemised list of what comes down, with anything excluded stated expressly.
Owner authority and disclosure warranty
The owner warrants authority to authorise demolition and that it has disclosed known hazardous conditions, tanks and services.
Scope, exclusions and final site condition
What is demolished, what is removed, what is left, the final levels, and an express list of what is not included.
Pre-start surveys as conditions precedent
The hazardous materials survey and the structural assessment, completed and provided before mobilisation rather than treated as background detail.
Regulatory notifications and consents
Who notifies whom, by when, who obtains the consent or permit, and the evidence to be given to the other party.
Utility disconnection and underground services
Services isolated and capped with documented evidence, and underground services located before any excavation.
Hazardous materials found despite the survey
Stop work, notify, price by written variation, and a clear rule on who bears the cost.
Salvage and scrap ownership
An explicit choice: contractor keeps salvage, owner keeps salvage, or listed items reserved. A material economic term, missing from free templates.
Waste handling and documentation
Licensed carriers and permitted sites only, with the transfer documentation delivered to the owner.
Dust, noise, vibration and adjoining properties
Suppression, working hours, vibration monitoring and a photographic pre-condition survey of the neighbours.
Site security and hoarding
Fencing, signage, out-of-hours security and responsibility for preventing unauthorised access.
Insurance with stated limits
Each cover named with a number, including pollution cover, with evidence before mobilisation and notice of cancellation.
Price, payment schedule and retention
Lump sum or rates, payment tied to milestones, and a retention percentage released on completion.
Programme, delay and unforeseen conditions
What extends the completion date and what does not.
Variations
Written, signed, priced, with the programme impact stated before the work proceeds.
Indemnity, liability cap and consequential loss
Mutual indemnity tied to fault, a cap with proper carve-outs, and a mutual exclusion of consequential loss.
Termination and the state of the site on termination
Cause and convenience, with a real number rather than a placeholder, and an obligation to leave the site safe and stable.
Third party property protection provisions
The competent person appointments, method statement, condition report, neighbour notification and insurance required by the rules on avoiding damage to third party property.
Consumer provisions
Switched on for a homeowner client: pre-contract information, the statutory withdrawal period where the contract is made off-premises or at a distance, and the reasonable care and skill obligation.

Malta demolition contract compliance checklist

The third party property framework and the Building and Construction Authority registration requirements are the two things to confirm before committing to a programme.

  • Comply with the third party property protection framework

    The rules governing avoidance of damage to third party property during construction and demolition cover competent person appointments, a method statement, a condition report of adjoining property, notification of neighbours and insurance.

    Building and Construction Authority (Malta)
  • Confirm the contractor’s registration covers this class of work

    Contractors carrying out construction and demolition work are subject to registration requirements, and specialist work must be done by appropriately licensed persons.

  • Obtain planning permission or demolition approval

    Demolition generally requires approval from the planning authority, with heritage considerations where the structure or its setting is protected.

    Planning Authority (Malta)
  • Carry out an asbestos and hazardous materials survey before work starts

    Survey the structures before demolition rather than treating hazardous material as a mid-job discovery, and handle each regulated stream under the applicable procedure.

  • Prepare the condition report of adjoining property before mobilisation

    This is both a regulatory requirement under the third party property rules and the practical document that resolves a later claim about pre-existing damage.

  • Confirm the waste disposal route before the first load

    Volumes are large relative to local capacity. Use authorised carriers and permitted facilities, manage hazardous streams separately, and keep the documentation.

    Environment and Resources Authority (Malta)
  • Require the insurance the framework and the site demand

    Third party liability and employers’ liability with stated limits, pollution cover, and the insurance required under the third party property rules. Evidence before mobilisation.

  • Decide salvage ownership before pricing

    Stone, apertures and architectural features have real value in this market. Settle who keeps them before the price is agreed.

  • Apply consumer protection where the owner is a homeowner

    Pre-contract information and, where the contract is concluded off-premises or at a distance, a statutory withdrawal period apply under the Consumer Affairs Act and the EU-derived regime.

    Malta Competition and Consumer Affairs Authority

How to complete the demolition contract

  1. Identify the property and the structures precisely. Address, title reference, and an itemised list of what comes down — plus an express list of what stays.
  2. Map the pre-start sequence and who does what. Confirm the Building and Construction Authority requirements, then name who makes the competent person appointments, who prepares the method statement and condition report, who notifies the adjoining owners, who obtains planning approval and who arranges disconnections.
  3. Decide salvage before you price the job. Choose whether the contractor keeps salvage, the owner keeps it, or specific items are reserved. If items are reserved, list them and set a collection deadline.
  4. Enter real insurance limits. Put numbers against third party liability, employers’ liability and pollution cover, and include the insurance required under the third party property rules. Set the date evidence is due.
  5. Build the payment schedule with retention. Tie payments to milestones, set the retention percentage and the release point, and state the basis on which late payment carries interest.
  6. Set the nuisance and neighbour controls. Working hours, dust suppression, vibration monitoring where relevant, the pre-condition survey of adjoining properties, and site security.
  7. Check the consumer position and fill in every number. If the owner is a homeowner, switch on the consumer block and give the pre-contract information and withdrawal notice. Then fill in every number — cure periods, retention, limits — before signing.

Demolition contracts in Malta — frequently asked questions

What are the third party property requirements for a demolition in Malta?

Maltese law regulates the avoidance of damage to third party property during construction and demolition, with requirements covering the appointment of competent persons, a method statement, a condition report of the adjoining property, notification of adjoining owners and occupiers, and insurance. In a dense built environment this is the regulatory spine of the project, not an optional extra, and the requirements should be confirmed with the Building and Construction Authority before a programme is committed.

Does the contractor need to be registered?

Contractors carrying out construction and demolition work in Malta are subject to registration requirements administered by the Building and Construction Authority, and specialist work must be carried out by appropriately licensed persons. Ask for the registration, check it covers the class of work you are asking for, and record it in the contract.

Why does the condition report matter so much?

Because almost every Maltese demolition has a neighbour sharing a wall or standing a few metres away, and the claim that the work caused a crack is close to inevitable. A condition report of the adjoining property prepared before mobilisation turns that claim from a dispute into a comparison — and it is also required under the third party property framework rather than merely advisable.

What should the contract say about waste?

That the disposal route is confirmed before mobilisation. Construction and demolition waste volumes are large relative to local capacity, so the contract should require authorised carriers and permitted facilities, separate management of asbestos and other hazardous streams, and delivery of weighbridge dockets and disposal documentation to the owner within a stated period after completion.

Who owns the stone and the apertures?

Whoever the contract says — and in Malta this is worth more than a passing mention, because traditional building materials, stone, apertures and architectural features have real resale value. Decide explicitly whether the contractor keeps the arisings, the owner does, or listed items are reserved, and if items are reserved set a deadline for collecting them.

Can I use this contract for work on my own home?

With the consumer block switched on, and after checking the current position. Consumer protection under the Consumer Affairs Act and the EU-derived regime requires specified information before the contract is made and, where the contract is concluded away from business premises or at a distance, gives a statutory withdrawal period. The contractor’s obligation to perform with reasonable care and skill is not excluded by anything in the contract.

Related templates

Disclaimer

This template and guide are general information only, not legal, tax, insurance, employment, consumer-credit, construction, dental or intellectual-property advice. No lawyer has reviewed your facts, and nothing here is certified as compliant with any law. Rules differ between jurisdictions and change over time — check the current position for your situation, and take professional advice before you sign or send.