Demolition Contract Template (Gibraltar)

Updated on 2 October 2026

A demolition contract allocates the work, the money, the risk and the regulatory duties. In Gibraltar one factor dominates the rest: density. Buildings share structure, sites are constrained, the public highway is usually a metre away, and there is very little room to make a mistake between the structure coming down and the neighbour’s wall.

That shapes what this contract has to do. The commercial terms are standard; the parts that earn their place are the pre-condition survey, the adjoining-owner provisions, the traffic and access arrangements, and a waste route confirmed before the first load rather than after it.

4 of 36 blanks filled

Tap any highlighted blank in the document below and type straight into it.Free — no sign-up, no watermark

Choose your version

Demolition Contract

This Demolition Contract is made on between of (the "Contractor"), holding , and of (the "Owner").

1. Property and structures

Property address:
Title reference:
Structures to be demolished:

The Owner warrants that it has lawful authority to authorise the demolition of the structures described, that it has disclosed all hazardous conditions, buried structures, tanks and services of which it is aware, and that no third party holds an interest that would prevent their demolition.

2. Scope of work

The Contractor will demolish the structures described, remove all resulting waste from the site, and leave the site in the following condition: . The work will be carried out in a good and workmanlike manner and in accordance with applicable law and the conditions of any consent or permit.

The following are expressly excluded and are not included in the Contract Price: . Anything not expressly included is excluded unless agreed by written variation.

3. Conditions precedent to starting work

The Contractor will not mobilise plant to the site, and demolition will not begin, until each of the following has been completed and evidence provided to the other party:

  • an asbestos and hazardous materials survey of the structures, commissioned by , with the report provided by ;
  • confirmation of the licensing or notification requirements that apply to asbestos work under Gibraltar law, and any notification filed by by within the required period;
  • the demolition consent, planning permission and any heritage approval the work requires, obtained by — in a dense and historic urban setting these are rarely a formality;
  • a written demolition method statement and risk assessment prepared under the supervision of , addressing the proximity of adjoining buildings and the public highway;
  • confirmation that electricity, water, telecommunications and drainage have been disconnected and capped outside the building line, with the utility providers notified at least working days in advance, and underground services located before any excavation;
  • agreement of the traffic management, access and material removal arrangements, which in a constrained urban site must be settled before plant arrives rather than improvised.

4. Hazardous materials found despite the survey

If asbestos, lead paint, contaminated ground, a buried tank, refrigerant gases or any other hazardous or regulated material is encountered that was not identified in the survey, the Contractor will stop work in the affected area, secure it and notify the Owner immediately. The additional work will be priced and agreed by written variation before it proceeds. The cost is borne by the Owner, except to the extent the material should reasonably have been identified by a survey for which the Contractor was responsible.

5. Salvage and scrap

All salvage, scrap and arisings become the property of the Contractor on removal from the structure, and the Contract Price has been set on that basis.

6. Waste handling and documentation

The Contractor will remove waste only through a carrier authorised to transport it and deposit it only at a site lawfully able to receive it, handling asbestos and other hazardous streams separately under the applicable procedure. Where waste leaves the territory, the Contractor is responsible for the transfrontier shipment documentation. Copies of all documentation will be delivered to the Owner within fourteen days of completion.

OptionalSet a waste diversion target

7. Site controls and neighbours

Work will be carried out only during . The Contractor will implement dust suppression, manage water used for suppression so that it does not discharge unlawfully from the site, and take reasonable measures to limit noise and disturbance to neighbouring occupiers.

OptionalInclude a pre-condition survey of adjoining properties

Before mobilisation the Contractor will carry out a photographic pre-condition survey of adjoining properties, boundaries, walls, driveways and highways likely to be affected, and provide a copy to the Owner.

OptionalInclude vibration monitoring
OptionalInclude site security and hoarding

The Contractor will secure the site with fencing or hoarding and appropriate signage, keep it secure outside working hours, and is responsible for preventing unauthorised access for the duration of the work.

OptionalInclude adjoining owner provisionsImportant in a dense urban setting where buildings commonly share structure.

8. Insurance

Before mobilisation and throughout the work the Contractor will maintain at its own expense:

  • public liability cover of not less than ;
  • employers’ liability cover of not less than , as required by law;
  • pollution or environmental liability cover of not less than , general liability policies commonly excluding pollution;
  • cover for damage to surrounding property and for the works themselves, appropriate to the value and location of the project.

Evidence of cover will be provided by and on each renewal, and the Contractor will notify the Owner in writing of cancellation, non-renewal or material change.

9. Contract price and payment

The Contract Price is . Payment is made as follows: . Each payment is due within days of a valid invoice. Overdue amounts carry interest on the following basis: .

OptionalWithhold retention

The Owner will withhold retention of % from each payment, released on completion of the work, delivery of the waste documentation and reinstatement of the site to the agreed condition.

10. Programme

Work will commence on or about , subject to the conditions precedent being satisfied, and is to be complete by . The completion date is extended by delay caused by weather, concealed or unforeseen site conditions, governmental or regulatory action, late consent, labour disputes or other events beyond the Contractor’s reasonable control, with prompt notice to the Owner.

11. Variations

No change to the scope, the Contract Price or the programme takes effect unless recorded in writing and signed by both parties, stating the change, the price adjustment and the programme impact. Verbal instructions do not vary this contract.

12. Indemnity and limitation of liability

Each party indemnifies the other against claims, damages, losses and reasonable costs arising from its own negligent acts or omissions, breach of this contract or breach of applicable law. The Owner additionally indemnifies the Contractor against claims arising from hazardous conditions the Owner knew of and did not disclose.

Except for fraud, wilful misconduct, death or personal injury caused by negligence, and any liability that cannot lawfully be limited, each party’s total liability under this contract is limited to , and neither party is liable for indirect or consequential loss including loss of profit, rent or use.

13. Termination

Either party may terminate on written notice if the other materially breaches this contract and fails to remedy within days of written notice. The Owner may terminate for convenience on written notice, in which case the Contractor is entitled to payment for work properly performed plus reasonable demobilisation costs. On termination for any reason the Contractor will cease operations, leave the site safe and secure with any partially demolished structure made stable, remove its plant and submit a final invoice.

14. General

  • Variation: only by a written document signed by both parties.
  • Assignment: neither party may assign without the other’s written consent, except to a successor that assumes these obligations.
  • Entire agreement: this contract, the scope documents and any signed variations are the whole agreement on their subject matter.
  • Severability: if any provision is invalid or unenforceable the rest continues in force.
  • Notices: in writing, by hand, courier, recorded delivery or email with confirmation of receipt.
  • Counterparts and electronic signature: this contract may be signed in counterparts and electronically.

15. Governing law and disputes

This contract is governed by the law of . The parties will first attempt to resolve any dispute by good-faith negotiation between senior representatives, and failing that will submit it to .

Contractor

Date signed:

Property Owner

Date signed:

Confirm the local consent and notification route first

Gibraltar legislates for itself on building, planning, heritage, health and safety and the environment, and the applicable statutes are published on the Gibraltar Laws database. A template written for England will carry assumptions — notice periods, prescribed forms, named authorities — that may not hold.

So the first step is to establish, for this specific site: what consent the demolition requires, which authority grants it, what notification or licensing applies to asbestos work, and what has to happen before work can begin. Then write those answers into the contract as conditions precedent with named responsible parties and dates, which is what this template is structured to do.

Heritage is a live consideration more often than elsewhere. A great deal of the building stock is old or within a protected setting, and a demolition that requires heritage approval is not a programme item you can compress.

Density: adjoining buildings and the public highway

Where buildings share structure, the single most valuable document in the file is the photographic pre-condition survey of the adjoining property, taken before mobilisation and provided to the owner. It converts the inevitable claim about a pre-existing crack from a dispute into a comparison.

The template also makes traffic management, access and material removal arrangements a condition precedent. On a constrained urban site these cannot be improvised once plant has arrived, and the cost and programme consequences of discovering that a skip cannot be positioned are borne by somebody.

Where the work affects a shared or party structure, or involves excavation that may affect support of an adjoining building, the owner serves any notice local legislation requires and obtains any consent before that part of the work begins. The template makes that an express precondition rather than an assumption.

Waste: confirm the route before you start

Disposal capacity is limited and some waste streams leave the territory, which brings transfrontier shipment documentation into play. A contractor who has not confirmed the disposal route before mobilisation can find itself with a loaded skip and nowhere lawful to take it.

The template requires the contractor to use an authorised carrier and a site lawfully able to receive the waste, to handle asbestos and other hazardous streams separately, to take responsibility for shipment documentation where waste leaves the territory, and to deliver copies of everything to the owner within fourteen days of completion.

Salvage, insurance and the commercial terms

Salvage is a material economic term and free templates omit it. Decide explicitly whether the contractor keeps the arisings, the owner does, or listed items are reserved with a collection deadline.

On insurance, require public liability and employers’ liability with stated limits, pollution or environmental liability — which general liability policies commonly exclude — and cover for damage to surrounding property appropriate to the location. In a dense setting the surrounding-property exposure is the real one, and "fully insured" is not a clause. Add retention, a liability cap with proper carve-outs, and a mutual exclusion of consequential loss.

Demolition contract clause guide

Parties, licence and registration details
Names both parties and records the contractor’s licence, registration or accreditation — absent from most free templates.
Property and structures in scope
Address, title reference, and an itemised list of what comes down, with anything excluded stated expressly.
Owner authority and disclosure warranty
The owner warrants authority to authorise demolition and that it has disclosed known hazardous conditions, tanks and services.
Scope, exclusions and final site condition
What is demolished, what is removed, what is left, the final levels, and an express list of what is not included.
Pre-start surveys as conditions precedent
The hazardous materials survey and the structural assessment, completed and provided before mobilisation rather than treated as background detail.
Regulatory notifications and consents
Who notifies whom, by when, who obtains the consent or permit, and the evidence to be given to the other party.
Utility disconnection and underground services
Services isolated and capped with documented evidence, and underground services located before any excavation.
Hazardous materials found despite the survey
Stop work, notify, price by written variation, and a clear rule on who bears the cost.
Salvage and scrap ownership
An explicit choice: contractor keeps salvage, owner keeps salvage, or listed items reserved. A material economic term, missing from free templates.
Waste handling and documentation
Licensed carriers and permitted sites only, with the transfer documentation delivered to the owner.
Dust, noise, vibration and adjoining properties
Suppression, working hours, vibration monitoring and a photographic pre-condition survey of the neighbours.
Site security and hoarding
Fencing, signage, out-of-hours security and responsibility for preventing unauthorised access.
Insurance with stated limits
Each cover named with a number, including pollution cover, with evidence before mobilisation and notice of cancellation.
Price, payment schedule and retention
Lump sum or rates, payment tied to milestones, and a retention percentage released on completion.
Programme, delay and unforeseen conditions
What extends the completion date and what does not.
Variations
Written, signed, priced, with the programme impact stated before the work proceeds.
Indemnity, liability cap and consequential loss
Mutual indemnity tied to fault, a cap with proper carve-outs, and a mutual exclusion of consequential loss.
Termination and the state of the site on termination
Cause and convenience, with a real number rather than a placeholder, and an obligation to leave the site safe and stable.
Adjoining owner provisions
Optional but rarely omitted here: notice to adjoining owners where local legislation requires it, and a photographic pre-condition survey before mobilisation.
Traffic management and access
Settled as a condition precedent, because a constrained urban site cannot absorb an improvised access arrangement once plant has arrived.
Consumer provisions
Switched on for a homeowner client: pre-contract information, limits on advance payment and any cancellation right under local consumer legislation.

Gibraltar demolition contract compliance checklist

Gibraltar has its own building, planning, heritage, safety and environmental legislation. Establish the local route for this site before writing a start date into the contract.

  • Confirm the consent and notification route on the Gibraltar statutes

    Establish what consent the demolition requires, which authority grants it, and what notification or licensing applies to asbestos work, from the Gibraltar legislation rather than by analogy.

    Gibraltar Laws
  • Check whether heritage or conservation approval applies

    Much of the building stock is old or sits within a protected setting. A heritage approval is not a programme item you can compress.

  • Carry out an asbestos and hazardous materials survey before work starts

    Survey the structures before demolition rather than treating asbestos as a mid-job discovery, and confirm the licensing or notification requirements for the work identified.

  • Make the pre-condition survey of adjoining buildings non-negotiable

    In a dense setting this is the document that resolves the inevitable claim about a pre-existing crack. Take it before mobilisation and give the owner a copy.

  • Settle traffic management and access before plant arrives

    A constrained urban site cannot absorb an improvised access or material removal arrangement. Agree it as a condition precedent and allocate the cost.

  • Confirm the waste disposal route before mobilisation

    Disposal capacity is limited and some streams leave the territory, bringing transfrontier shipment documentation into play. Confirm the route before the first load, not after.

  • Require insurance covering damage to surrounding property

    In a dense setting the surrounding-property exposure is the real one. Require public liability, employers’ liability and pollution cover with stated limits, plus cover appropriate to the location.

  • Decide salvage ownership before pricing

    Steel, copper, brick and fixtures can be a meaningful share of contract value, and silence produces two different assumptions.

  • Check consumer requirements for a homeowner client

    Local consumer protection legislation may require specified pre-contract information, limit advance payment and give a cancellation right in defined circumstances.

How to complete the demolition contract

  1. Identify the property and the structures precisely. Address, title reference, and an itemised list of what comes down — plus an express list of what stays.
  2. Map the pre-start sequence and who does what. Establish from the Gibraltar legislation what consent and notification this demolition needs, then name who commissions the asbestos survey, who obtains the consent, who files any notification, who arranges disconnections, and who agrees the traffic and access plan.
  3. Decide salvage before you price the job. Choose whether the contractor keeps salvage, the owner keeps it, or specific items are reserved. If items are reserved, list them and set a collection deadline.
  4. Enter real insurance limits. Put numbers against public liability, employers’ liability and pollution cover, and add cover for damage to surrounding property appropriate to a dense urban site. Set the date evidence is due.
  5. Build the payment schedule with retention. Tie payments to milestones, set the retention percentage and the release point, and state the basis on which late payment carries interest.
  6. Set the nuisance and neighbour controls. Working hours, dust suppression, vibration monitoring where relevant, the pre-condition survey of adjoining properties, and site security.
  7. Check the consumer position and fill in every number. If the owner is a homeowner, check the local consumer requirements and switch on the consumer block. Then fill in every number — cure periods, notice periods, retention, limits — before signing.

Demolition contracts in Gibraltar — frequently asked questions

What consent does a demolition in Gibraltar need?

That has to be established from the Gibraltar legislation for the specific site rather than assumed from the English position. Gibraltar legislates for itself on building, planning, heritage, health and safety and the environment, and the statutes are published on the Gibraltar Laws database. Establish the consent, the authority and the notification requirements first, then write them into the contract as conditions precedent.

Why is the pre-condition survey so important here?

Because buildings share structure and sites are tight. A photographic survey of the adjoining property taken before mobilisation converts the inevitable claim about a pre-existing crack from a dispute into a comparison. In a dense setting it is the single most valuable document in the file, and it costs very little relative to the claim it prevents.

Do I need to notify the neighbours?

Where the work affects a shared or party structure, or involves excavation that may affect support of an adjoining building, the owner is responsible for giving any notice local legislation requires and obtaining any consent — and that part of the work should not begin until the position is resolved in writing. Given the density of construction, this applies to more projects here than it would elsewhere.

What should the contract say about waste disposal?

That the route is confirmed before mobilisation. Disposal capacity is limited and some streams leave the territory, which brings transfrontier shipment documentation into play. Require an authorised carrier, a site lawfully able to receive the waste, separate handling of asbestos and other hazardous streams, and delivery of all documentation to the owner.

What insurance should a demolition contractor carry?

Public liability and employers’ liability with stated limits, pollution or environmental liability — general liability policies commonly exclude pollution — and cover for damage to surrounding property appropriate to the location. On a constrained site surrounded by occupied buildings, the surrounding-property exposure is the one that matters, and "fully insured" is not an insurance clause.

Who owns the salvage?

Whoever the contract says. Demolition prices are frequently quoted on the assumption that the contractor keeps the steel, copper, brick and fixtures, while owners frequently assume the opposite. Decide explicitly, and if you want to keep particular items, list them and set a deadline for collecting them.

Related templates

Disclaimer

This template and guide are general information only, not legal, tax, insurance, employment, consumer-credit, construction, dental or intellectual-property advice. No lawyer has reviewed your facts, and nothing here is certified as compliant with any law. Rules differ between jurisdictions and change over time — check the current position for your situation, and take professional advice before you sign or send.