A demolition contract allocates the work, the money, the risk and — more than in any other trade document — the regulatory duties. In the UK the sequence before the first machine arrives is itself prescribed: survey, notify, serve notice, wait, disconnect, then demolish. A contract that treats that as background detail has missed the main event.
The widely copied free template is reasonably drafted on commercial terms and has almost none of the regulatory spine. It treats asbestos as something that might be discovered mid-job, says nothing about notifying anyone, nothing about the notice you must serve on the local authority, and nothing about who owns the scrap.
Tap any highlighted blank in the document below and type straight into it.Free — no sign-up, no watermark
Choose your version
Demolition Contract
This Demolition Contract is made on between of (the "Contractor"), holding , and of (the "Owner").
1. Property and structures
- Property address:
- Title reference:
- Structures to be demolished:
The Owner warrants that it has lawful authority to authorise the demolition of the structures described, that it has disclosed all hazardous conditions, buried structures, tanks and services of which it is aware, and that no third party holds an interest that would prevent their demolition.
2. Scope of work
The Contractor will demolish the structures described, remove all resulting waste from the site, and leave the site in the following condition: . The work will be carried out in a good and workmanlike manner and in accordance with applicable law and the conditions of any consent or permit.
The following are expressly excluded and are not included in the Contract Price: . Anything not expressly included is excluded unless agreed by written variation.
3. Conditions precedent to starting work
The Contractor will not mobilise plant to the site, and demolition will not begin, until each of the following has been completed and evidence provided to the other party:
- a refurbishment and demolition asbestos survey of the structures, commissioned by , with the report provided by — a survey of this type is required before refurbishment or demolition work, not only where asbestos is suspected;
- where licensed asbestos work is required, notification to the enforcing authority at least fourteen days before that work starts, filed by by , together with a suitable and sufficient plan of work;
- notice of intended demolition given to the local authority under the Building Act 1984, by , with demolition not beginning until the authority has served a counter-notice or the six-week relevant period has expired;
- any planning permission, listed building consent or conservation area consent that the demolition requires;
- a written demolition method statement and risk assessment prepared under the supervision of , and the construction phase plan and other duty-holder documentation required under the construction design and management regime;
- confirmation that gas, electricity, water, telecoms and drainage have been disconnected and capped outside the building line, with the service providers notified at least working days in advance, and underground services located before any excavation.
4. Hazardous materials found despite the survey
If asbestos, lead paint, contaminated ground, a buried tank, refrigerant gases or any other hazardous or regulated material is encountered that was not identified in the survey, the Contractor will stop work in the affected area, secure it and notify the Owner immediately. The additional work will be priced and agreed by written variation before it proceeds. The cost is borne by the Owner, except to the extent the material should reasonably have been identified by a survey for which the Contractor was responsible.
5. Salvage and scrap
All salvage, scrap and arisings become the property of the Contractor on removal from the structure, and the Contract Price has been set on that basis.
6. Waste handling and documentation
The Contractor will remove waste only through a registered waste carrier and deposit it only at a site holding the appropriate environmental permit or exemption. The Contractor will complete waste transfer documentation for every load, handle hazardous waste streams including asbestos separately and under the applicable consignment procedure, and deliver copies of all documentation to the Owner within fourteen days of completion.
7. Site controls and neighbours
Work will be carried out only during . The Contractor will implement dust suppression, manage water used for suppression so that it does not discharge unlawfully from the site, and take reasonable measures to limit noise and disturbance to neighbouring occupiers.
Before mobilisation the Contractor will carry out a photographic pre-condition survey of adjoining properties, boundaries, walls, driveways and highways likely to be affected, and provide a copy to the Owner.
The Contractor will secure the site with fencing or hoarding and appropriate signage, keep it secure outside working hours, and is responsible for preventing unauthorised access for the duration of the work.
8. Insurance
Before mobilisation and throughout the work the Contractor will maintain at its own expense:
- public liability cover of not less than ;
- employers’ liability cover of not less than , as required by law;
- pollution or environmental liability cover of not less than , general liability policies commonly excluding pollution;
- cover for damage to surrounding property and for the works themselves, appropriate to the value and location of the project.
Evidence of cover will be provided by and on each renewal, and the Contractor will notify the Owner in writing of cancellation, non-renewal or material change.
9. Contract price and payment
The Contract Price is . Payment is made as follows: . Each payment is due within days of a valid invoice. Overdue amounts carry interest on the following basis: .
The Owner will withhold retention of % from each payment, released on completion of the work, delivery of the waste documentation and reinstatement of the site to the agreed condition.
10. Programme
Work will commence on or about , subject to the conditions precedent being satisfied, and is to be complete by . The completion date is extended by delay caused by weather, concealed or unforeseen site conditions, governmental or regulatory action, late consent, labour disputes or other events beyond the Contractor’s reasonable control, with prompt notice to the Owner.
11. Variations
No change to the scope, the Contract Price or the programme takes effect unless recorded in writing and signed by both parties, stating the change, the price adjustment and the programme impact. Verbal instructions do not vary this contract.
12. Indemnity and limitation of liability
Each party indemnifies the other against claims, damages, losses and reasonable costs arising from its own negligent acts or omissions, breach of this contract or breach of applicable law. The Owner additionally indemnifies the Contractor against claims arising from hazardous conditions the Owner knew of and did not disclose.
Except for fraud, wilful misconduct, death or personal injury caused by negligence, and any liability that cannot lawfully be limited, each party’s total liability under this contract is limited to , and neither party is liable for indirect or consequential loss including loss of profit, rent or use.
13. Termination
Either party may terminate on written notice if the other materially breaches this contract and fails to remedy within days of written notice. The Owner may terminate for convenience on written notice, in which case the Contractor is entitled to payment for work properly performed plus reasonable demobilisation costs. On termination for any reason the Contractor will cease operations, leave the site safe and secure with any partially demolished structure made stable, remove its plant and submit a final invoice.
14. General
- Variation: only by a written document signed by both parties.
- Assignment: neither party may assign without the other’s written consent, except to a successor that assumes these obligations.
- Entire agreement: this contract, the scope documents and any signed variations are the whole agreement on their subject matter.
- Severability: if any provision is invalid or unenforceable the rest continues in force.
- Notices: in writing, by hand, courier, recorded delivery or email with confirmation of receipt.
- Counterparts and electronic signature: this contract may be signed in counterparts and electronically.
15. Governing law and disputes
This contract is governed by the law of . The parties will first attempt to resolve any dispute by good-faith negotiation between senior representatives, and failing that will submit it to .
Contractor
Date signed:
Property Owner
Date signed:
Asbestos: survey first, then notify, then demolish
Under the Control of Asbestos Regulations 2012, a refurbishment and demolition survey must be carried out before refurbishment or demolition work to identify asbestos-containing materials in the area affected. It is not conditional on anyone suspecting asbestos is present — it is the starting point, and for a demolition it means a full survey rather than a management survey.
Where the work identified is licensable, it can only be carried out by a licensed contractor and must be notified to the enforcing authority at least fourteen days before it starts, with a suitable and sufficient plan of work and confirmation of the licence.
So "if hazardous materials are discovered, the Contractor shall notify the Owner" — the free template’s position — describes the wrong moment entirely. This template puts the survey and the notification into the critical path as conditions precedent, names who commissions and who files, and keeps a discovery clause for material found despite the survey, because that happens.
The section 80 notice and the six-week wait
This is the duty UK clients most often discover late. Under section 80 of the Building Act 1984, a person intending to demolish a building to which the section applies must give notice to the local authority, with copies to the occupiers of adjacent buildings and to the relevant gas and electricity suppliers. There are exceptions, including for small structures below a stated size and most agricultural buildings.
Crucially, demolition must not begin until either the local authority has served a counter-notice under section 81 or the relevant period has expired — and that period is six weeks from the giving of the section 80 notice, unless the person who gave it allows longer in writing. Breach is an offence punishable by a fine.
Six weeks is a programme item, not a formality. Build it into the start date, not into the excuses. The template makes service of the notice and the expiry of the period an express condition precedent to mobilisation.
CDM duties, salvage and the things the free version omits
Demolition is construction work and the construction design and management regime applies, bringing duty-holder appointments, a construction phase plan and notification of the project to the enforcing authority where thresholds are met. The template requires the method statement, the risk assessment and the duty-holder documentation before mobilisation.
Salvage is the commercial term most often left out. Structural steel, copper, brick, architectural features and plant can be worth a meaningful share of the contract value, and demolition prices are frequently quoted on the assumption the contractor keeps them. If the contract is silent you have two different assumptions and no way to resolve them, so the template forces an explicit choice.
Also added: licensed waste carriers and permitted disposal sites with transfer documentation delivered to the owner; working hours, dust suppression and vibration monitoring; a photographic pre-condition survey of the neighbours; site security; retention; a liability cap; and an optional party wall block, because excavation near a neighbouring building and work to a party structure both engage the party wall legislation and the owner, not the contractor, serves those notices.
Where the owner is a homeowner
Residential demolition for a consumer brings consumer contract rules: information that must be given before the contract is made, and a cancellation period where the contract was concluded away from the contractor’s premises or at a distance. A consumer who asks for work to start inside the cancellation period can be required to pay for what has been done if they then cancel — but only if the right notices were given.
The template includes a consumer block that switches on when you select a homeowner, and confirms that the statutory obligation to carry out the service with reasonable care and skill is not excluded.
Demolition contract clause guide
- Parties, licence and registration details
- Names both parties and records the contractor’s licence, registration or accreditation — absent from most free templates.
- Property and structures in scope
- Address, title reference, and an itemised list of what comes down, with anything excluded stated expressly.
- Owner authority and disclosure warranty
- The owner warrants authority to authorise demolition and that it has disclosed known hazardous conditions, tanks and services.
- Scope, exclusions and final site condition
- What is demolished, what is removed, what is left, the final levels, and an express list of what is not included.
- Pre-start surveys as conditions precedent
- The hazardous materials survey and the structural assessment, completed and provided before mobilisation rather than treated as background detail.
- Regulatory notifications and consents
- Who notifies whom, by when, who obtains the consent or permit, and the evidence to be given to the other party.
- Utility disconnection and underground services
- Services isolated and capped with documented evidence, and underground services located before any excavation.
- Hazardous materials found despite the survey
- Stop work, notify, price by written variation, and a clear rule on who bears the cost.
- Salvage and scrap ownership
- An explicit choice: contractor keeps salvage, owner keeps salvage, or listed items reserved. A material economic term, missing from free templates.
- Waste handling and documentation
- Licensed carriers and permitted sites only, with the transfer documentation delivered to the owner.
- Dust, noise, vibration and adjoining properties
- Suppression, working hours, vibration monitoring and a photographic pre-condition survey of the neighbours.
- Site security and hoarding
- Fencing, signage, out-of-hours security and responsibility for preventing unauthorised access.
- Insurance with stated limits
- Each cover named with a number, including pollution cover, with evidence before mobilisation and notice of cancellation.
- Price, payment schedule and retention
- Lump sum or rates, payment tied to milestones, and a retention percentage released on completion.
- Programme, delay and unforeseen conditions
- What extends the completion date and what does not.
- Variations
- Written, signed, priced, with the programme impact stated before the work proceeds.
- Indemnity, liability cap and consequential loss
- Mutual indemnity tied to fault, a cap with proper carve-outs, and a mutual exclusion of consequential loss.
- Termination and the state of the site on termination
- Cause and convenience, with a real number rather than a placeholder, and an obligation to leave the site safe and stable.
- Party wall and adjoining owner provisions
- Optional. Where work affects a party structure or involves excavation near a neighbouring building, the owner serves the notices and obtains any award before that work begins.
- Consumer provisions
- Switched on for a homeowner client: pre-contract information, the cancellation period, and the statutory reasonable care and skill obligation.
UK demolition contract compliance checklist
Demolition engages health and safety, building control, planning, environmental and sometimes party wall legislation at once. Work through this before mobilisation, not afterwards.
Carry out a refurbishment and demolition asbestos survey first
The Control of Asbestos Regulations 2012 require a survey before refurbishment or demolition work to identify asbestos-containing materials in the affected area. For demolition this means a full R&D survey, not a management survey.
HSE — asbestos surveysNotify licensed asbestos work at least 14 days ahead
Licensed asbestos work must be notified to the enforcing authority at least fourteen days before it starts, with a plan of work and confirmation of the licence, and may only be done by a licensed contractor.
HSE — asbestos licensing and notificationServe the section 80 notice and wait out the period
Notice of intended demolition must be given to the local authority, with copies to adjacent occupiers and the gas and electricity suppliers, and work must not begin until a counter-notice is served or the relevant period expires.
Building Act 1984, section 80Build the six-week period into the programme
The relevant period is six weeks from the giving of the section 80 notice, or longer if the person giving it allows in writing. It is a programme item, not a formality.
Building Act 1984, section 81Apply the construction design and management duties
Demolition is construction work. Duty-holder appointments, a construction phase plan and notification of the project where thresholds are met all apply.
HSE — CDM 2015Check planning, listed building and conservation area consents
Demolition can require planning permission, listed building consent or conservation area consent. Confirm before committing to a start date.
Use registered waste carriers and permitted sites
Waste must be carried by a registered carrier and deposited at a site with the appropriate permit or exemption, with transfer documentation for every load and separate handling for hazardous streams.
Environment Agency — waste duty of careDecide salvage ownership before pricing
Structural steel, copper, brick and plant can be a meaningful share of contract value. Silence produces two different assumptions and no way to resolve them.
Deal with party walls and excavation near neighbours
Work to a party structure, and excavation within the distances the party wall legislation specifies, require notice to adjoining owners — served by the building owner, not the contractor.
GOV.UK — party wall etc. Act 1996 guidanceFollow consumer contract rules for a homeowner client
Pre-contract information, the cancellation period where the contract was concluded off-premises or at a distance, and the consequences of starting work during it.
How to complete the demolition contract
- Identify the property and the structures precisely. Address, title reference, and an itemised list of what comes down — plus an express list of what stays.
- Map the pre-start sequence and who does what. Name who commissions the R&D asbestos survey, who notifies licensed work fourteen days ahead, who serves the section 80 notice and when the six-week period expires, who obtains any planning consent, and who arranges the disconnections.
- Decide salvage before you price the job. Choose whether the contractor keeps salvage, the owner keeps it, or specific items are reserved. If items are reserved, list them and set a collection deadline.
- Enter real insurance limits. Put numbers against public liability, employers’ liability and pollution cover, and set the date evidence is due. Ask specifically about pollution, which general liability policies commonly exclude.
- Build the payment schedule with retention. Tie payments to milestones, set the retention percentage and the release point, and state the basis on which late payment carries interest.
- Set the nuisance and neighbour controls. Working hours, dust suppression, vibration monitoring where relevant, the pre-condition survey of adjoining properties, and site security.
- Check the consumer position and fill in every number. If the owner is a homeowner, switch on the consumer block and give the pre-contract information and cancellation notice. Then fill in every number — cure periods, notice periods, limits — before signing.
Demolition contracts in the UK — frequently asked questions
Do I need an asbestos survey even if the building obviously has none?
Yes. The Control of Asbestos Regulations 2012 require a survey before refurbishment or demolition work to identify asbestos-containing materials in the area affected, and for a demolition that means a full refurbishment and demolition survey rather than a management survey. The duty is not triggered by suspicion — it is the first step in the sequence.
What is a section 80 notice and how long does it take?
Under the Building Act 1984 a person intending to demolish a building to which the section applies must notify the local authority, with copies to adjacent occupiers and the gas and electricity suppliers. Demolition must not begin until the authority serves a counter-notice under section 81 or the relevant period expires — six weeks from the giving of the notice, unless the person giving it allows longer in writing. Build it into the programme.
How much notice does licensed asbestos work need?
At least fourteen days to the enforcing authority before the work starts, together with a suitable and sufficient plan of work and confirmation of the contractor’s licence — and the work can only be carried out by a licensed contractor. That fourteen days runs alongside, not instead of, the six-week section 80 period.
Who owns the scrap metal and salvaged materials?
Whoever the contract says. If it is silent you have a dispute waiting, because demolition prices are frequently quoted on the assumption the contractor keeps the salvage and owners frequently assume the opposite. Decide it explicitly, and if you are reserving particular items — architectural features, specific plant — list them and set a collection deadline.
Do I need to tell the neighbours?
Often yes, on two separate grounds. The section 80 notice requires copies to the occupiers of adjacent buildings. Separately, work to a party structure or excavation within the distances the party wall legislation specifies requires notice to adjoining owners, served by the building owner rather than the contractor. A photographic pre-condition survey of the neighbouring property is also worth doing for your own protection.
Is this template suitable for demolishing a house I live in?
With the consumer block switched on, and with care. A consumer contract requires specified information to be given before the contract is made and, where it was concluded away from the contractor’s premises or at a distance, carries a cancellation period. A consumer who asks for work to start within that period can be required to pay for what was done if they cancel — but only if the right notices were given first.
Related templates
Disclaimer
This template and guide are general information only, not legal, tax, insurance, employment, consumer-credit, construction, dental or intellectual-property advice. No lawyer has reviewed your facts, and nothing here is certified as compliant with any law. Rules differ between jurisdictions and change over time — check the current position for your situation, and take professional advice before you sign or send.