Construction Invoice Generator Canada

Create a Canadian construction invoice with site address, contract reference, progress claim, materials, labour, holdback, GST/HST and change order fields.

Your Business Information

Client Information

Brand Your Invoice

Add your logo

Invoice design

Invoice Details

Line Items

GST/HST
C$0.00
GST/HST
C$0.00
GST/HST
C$0.00
GST/HST
C$0.00
GST/HST
C$0.00
GST/HST
C$0.00
GST/HST
C$0.00
GST/HST
C$0.00
Subtotal:C$0.00
C$0.00
(%)
C$0.00

GST/HST is applied only to line items with the “GST/HST” box checked.

Total:C$0.00
C$0.00
Balance Due:C$0.00

Signature

Add your authorized signature. It will only appear on the invoice preview and PDF if you actually sign.

Preview:

Your typed signature will appear here

Free invoicing app

Invoice24 logo

Trusted by 3,000,000+ businesses worldwide

Send invoices in seconds, track payments and stay on top of your cash flow — all from your phone with the Invoice24 mobile app.

Download on the App StoreGet it on Google Play
Your Business
INVOICE
Client Information
Invoice Date
DescriptionQuantityRateAmount
Site preparation & set-out — labour, 1 day1C$0.00C$0.00
Materials — timber, fixings & consumables (supply)1C$0.00C$0.00
Labour — carpentry & installation, 24 hrs @ hourly rate24C$0.00C$0.00
Plant & equipment hire — mini excavator, 2 days2C$0.00C$0.00
Subcontract works — electrical rough-in1C$0.00C$0.00
Variation VO-002 — additional waterproofing (approved — add date)1C$0.00C$0.00
Waste removal & final site clean1C$0.00C$0.00
Less previously claimed — claims 1–21C$0.00C$0.00
SubtotalC$0.00
GST/HST (5%)C$0.00
TotalC$0.00

Construction invoice generator for Canadian contractors

Create a Canadian construction invoice for building work, subcontracting, renovations, progress billing, materials, labour, equipment, change orders, deposits and holdbacks. The PDF includes site address, contract reference, claim period, GST/HST and payment details.

Construction billing in Canada is province-specific. Use this generator as a clear invoice or progress claim record, then add any lien, prompt-payment, holdback, licence or contract wording required in your province and agreement.

What a Canadian construction invoice should include

  • Contractor or subcontractor name, business number, GST/HST account number where applicable and contact details.
  • Client, owner, general contractor, property manager or project payer details.
  • Site address, project name, contract, purchase order, estimate, draw or progress claim reference.
  • Separate labour, materials, equipment, subcontractor, permit, change order and disposal lines.
  • GST/HST amount for taxable construction supplies when the business is registered.
  • Holdback, deposit, prior payments, payment terms, due date and supporting document references.

Progress claims, holdbacks and provincial rules

Canadian lien, holdback and prompt-payment rules are provincial or territorial, not one national rule. The invoice should identify the site, contract, claim period and scope so it can be matched to the job record.

Use notes for statutory wording, certificate references, payment claim language, substantial performance, deficiency holdback or contract-specific release conditions.

GST/HST, PST and materials

CRA guidance says the GST/HST rate depends on place of supply and supply type. Construction work is often taxable, but the province, project type, customer and contract structure can affect how GST/HST and separate provincial sales tax are handled.

Keep materials and labour separate for customer review, job costing, change orders, warranty and any provincial tax or contract review.

Common Canadian construction invoice mistakes

  • Leaving out the job site, contract or progress claim period.
  • Hiding holdback, deposits or prior payments inside the description.
  • Bundling materials, labour, equipment and change orders into one line.
  • Assuming every province uses the same lien, prompt-payment or sales-tax treatment.
  • Treating the invoice as a substitute for lien waivers, notices or contract forms.

Canada Invoice Generator

FAQs about Canadian construction invoices