Demolition Contract Template (Canada)
Updated on October 2, 2026
A demolition contract allocates the work, the money, the risk and the regulatory duties. In Canada the duty that most often catches owners is one that bites before the contract exists at all: in several provinces the owner of a project must determine whether designated substances are present and give the list to everyone tendering, before the project goes out to tender.
Get that wrong and you have priced the job on incomplete information, exposed bidders to a hazard they did not know about, and created a variation claim on day one. The free template contains nothing about it.
Tap any highlighted blank in the document below and type straight into it.Free — no sign-up, no watermark
Choose your version
Demolition Contract
This Demolition Contract is made on between of (the "Contractor"), holding , and of (the "Owner").
1. Property and structures
- Property address:
- Title reference:
- Structures to be demolished:
The Owner warrants that it has lawful authority to authorise the demolition of the structures described, that it has disclosed all hazardous conditions, buried structures, tanks and services of which it is aware, and that no third party holds an interest that would prevent their demolition.
2. Scope of work
The Contractor will demolish the structures described, remove all resulting waste from the site, and leave the site in the following condition: . The work will be carried out in a good and workmanlike manner and in accordance with applicable law and the conditions of any consent or permit.
The following are expressly excluded and are not included in the Contract Price: . Anything not expressly included is excluded unless agreed by written variation.
3. Conditions precedent to starting work
The Contractor will not mobilise plant to the site, and demolition will not begin, until each of the following has been completed and evidence provided to the other party:
- a designated substances survey of the structures, commissioned by , with the report provided by — in several provinces the owner of a project must determine whether designated substances are present and provide the list to everyone tendering, before the project is tendered;
- the asbestos, lead and mould management plans required for the type and classification of the work identified by that survey;
- notice of project to the occupational health and safety regulator where the project is of a kind that must be notified, filed by by ;
- the municipal demolition permit and any heritage or planning approval, obtained by ;
- a written demolition procedure and risk assessment prepared under the supervision of ;
- confirmation that electricity, gas, water, telecommunications and sewer services have been disconnected and capped outside the building line, with the utilities notified at least working days in advance, and underground services located through the provincial one-call service before any excavation.
4. Hazardous materials found despite the survey
If asbestos, lead paint, contaminated ground, a buried tank, refrigerant gases or any other hazardous or regulated material is encountered that was not identified in the survey, the Contractor will stop work in the affected area, secure it and notify the Owner immediately. The additional work will be priced and agreed by written variation before it proceeds. The cost is borne by the Owner, except to the extent the material should reasonably have been identified by a survey for which the Contractor was responsible.
5. Salvage and scrap
All salvage, scrap and arisings become the property of the Contractor on removal from the structure, and the Contract Price has been set on that basis.
6. Waste handling and documentation
The Contractor will transport and dispose of waste only at facilities lawfully able to receive it, will manage designated substance waste including asbestos in accordance with the applicable regulations and manifest requirements, and will deliver copies of weigh tickets, manifests and disposal receipts to the Owner within fourteen days of completion.
7. Site controls and neighbours
Work will be carried out only during . The Contractor will implement dust suppression, manage water used for suppression so that it does not discharge unlawfully from the site, and take reasonable measures to limit noise and disturbance to neighbouring occupiers.
Before mobilisation the Contractor will carry out a photographic pre-condition survey of adjoining properties, boundaries, walls, driveways and highways likely to be affected, and provide a copy to the Owner.
The Contractor will secure the site with fencing or hoarding and appropriate signage, keep it secure outside working hours, and is responsible for preventing unauthorised access for the duration of the work.
8. Insurance
Before mobilisation and throughout the work the Contractor will maintain at its own expense:
- commercial general liability cover of not less than ;
- workers’ compensation board coverage of not less than , as required by law;
- pollution or environmental liability cover of not less than , general liability policies commonly excluding pollution;
- cover for damage to surrounding property and for the works themselves, appropriate to the value and location of the project.
Evidence of cover will be provided by and on each renewal, and the Contractor will notify the Owner in writing of cancellation, non-renewal or material change.
9. Contract price and payment
The Contract Price is . Payment is made as follows: . Each payment is due within days of a valid invoice. Overdue amounts carry interest on the following basis: .
The Owner will withhold retention of % from each payment, released on completion of the work, delivery of the waste documentation and reinstatement of the site to the agreed condition.
10. Programme
Work will commence on or about , subject to the conditions precedent being satisfied, and is to be complete by . The completion date is extended by delay caused by weather, concealed or unforeseen site conditions, governmental or regulatory action, late consent, labour disputes or other events beyond the Contractor’s reasonable control, with prompt notice to the Owner.
11. Variations
No change to the scope, the Contract Price or the programme takes effect unless recorded in writing and signed by both parties, stating the change, the price adjustment and the programme impact. Verbal instructions do not vary this contract.
12. Indemnity and limitation of liability
Each party indemnifies the other against claims, damages, losses and reasonable costs arising from its own negligent acts or omissions, breach of this contract or breach of applicable law. The Owner additionally indemnifies the Contractor against claims arising from hazardous conditions the Owner knew of and did not disclose.
Except for fraud, wilful misconduct, death or personal injury caused by negligence, and any liability that cannot lawfully be limited, each party’s total liability under this contract is limited to , and neither party is liable for indirect or consequential loss including loss of profit, rent or use.
13. Termination
Either party may terminate on written notice if the other materially breaches this contract and fails to remedy within days of written notice. The Owner may terminate for convenience on written notice, in which case the Contractor is entitled to payment for work properly performed plus reasonable demobilisation costs. On termination for any reason the Contractor will cease operations, leave the site safe and secure with any partially demolished structure made stable, remove its plant and submit a final invoice.
14. General
- Variation: only by a written document signed by both parties.
- Assignment: neither party may assign without the other’s written consent, except to a successor that assumes these obligations.
- Entire agreement: this contract, the scope documents and any signed variations are the whole agreement on their subject matter.
- Severability: if any provision is invalid or unenforceable the rest continues in force.
- Notices: in writing, by hand, courier, recorded delivery or email with confirmation of receipt.
- Counterparts and electronic signature: this contract may be signed in counterparts and electronically.
15. Governing law and disputes
This contract is governed by the law of . The parties will first attempt to resolve any dispute by good-faith negotiation between senior representatives, and failing that will submit it to .
Contractor
Date signed:
Property Owner
Date signed:
The designated substances survey comes before the tender
Occupational health and safety legislation in several provinces requires the owner of a construction project to determine whether designated substances are present at the site and to prepare a list of them, including asbestos, before the project is tendered — and to provide that list to every person submitting a tender.
That timing is the point. It is not a pre-start step the contractor arranges after award; it is a pre-tender step the owner must complete, so that bids are priced on the same information. Construction projects where asbestos-containing material may be handled include demolition projects, and the owner must supply the demolition contractor with the designated substance report.
Sampling and analysis of suspect materials has to be done by a competent worker in accordance with the applicable asbestos regulation. The template therefore makes the survey an express condition precedent, names who commissioned it and when the report is due, and requires it to be given to the contractor.
Notices, permits and locates
A notice of project to the occupational health and safety regulator is required for projects of a kind the regulations specify, and the municipality will require a demolition permit, often with heritage or planning approval attached and conditions about hoarding, pest control and the restoration of the site.
Before any excavation, underground services must be located through the provincial one-call service. Contacting it is commonly a statutory requirement with its own notice period and marking validity, and striking an unmarked line is both dangerous and expensive.
The template makes each of these a named condition precedent with a responsible party and a date, rather than a general promise to comply with applicable law.
Holdback, liens and getting paid
Construction lien and holdback legislation is provincial, and it is one of the few areas where a contract cannot simply do as it pleases. The statutory holdback is a percentage retained from each payment for a defined period, and the regime also sets out how a lien is preserved and perfected, and increasingly imposes prompt payment and adjudication requirements with strict timelines for responding to a proper invoice.
For an owner that means two things. Retain the statutory holdback and release it only when the legislation allows. And treat an invoice as starting a clock: in provinces with prompt payment rules, failing to issue a notice of non-payment within the prescribed period can leave you obliged to pay a disputed amount.
The template includes a holdback field and a payment schedule, but the percentages and periods must come from your province’s statute, not from the template.
Salvage, waste and the neighbours
Salvage is a material economic term and the free template ignores it. Decide explicitly whether the contractor keeps the steel, copper and fixtures, or whether listed items are reserved to the owner with a collection deadline.
On waste, dispose only at facilities lawfully able to receive it, manage designated substance waste under the applicable manifest requirements, and get the documentation. On neighbours, add working hours, dust suppression, optional vibration monitoring, a pre-condition survey of adjoining property, and the notices any municipal by-law requires where excavation may affect support of a neighbouring building.
Demolition contract clause guide
- Parties, licence and registration details
- Names both parties and records the contractor’s licence, registration or accreditation — absent from most free templates.
- Property and structures in scope
- Address, title reference, and an itemised list of what comes down, with anything excluded stated expressly.
- Owner authority and disclosure warranty
- The owner warrants authority to authorise demolition and that it has disclosed known hazardous conditions, tanks and services.
- Scope, exclusions and final site condition
- What is demolished, what is removed, what is left, the final levels, and an express list of what is not included.
- Pre-start surveys as conditions precedent
- The hazardous materials survey and the structural assessment, completed and provided before mobilisation rather than treated as background detail.
- Regulatory notifications and consents
- Who notifies whom, by when, who obtains the consent or permit, and the evidence to be given to the other party.
- Utility disconnection and underground services
- Services isolated and capped with documented evidence, and underground services located before any excavation.
- Hazardous materials found despite the survey
- Stop work, notify, price by written variation, and a clear rule on who bears the cost.
- Salvage and scrap ownership
- An explicit choice: contractor keeps salvage, owner keeps salvage, or listed items reserved. A material economic term, missing from free templates.
- Waste handling and documentation
- Licensed carriers and permitted sites only, with the transfer documentation delivered to the owner.
- Dust, noise, vibration and adjoining properties
- Suppression, working hours, vibration monitoring and a photographic pre-condition survey of the neighbours.
- Site security and hoarding
- Fencing, signage, out-of-hours security and responsibility for preventing unauthorised access.
- Insurance with stated limits
- Each cover named with a number, including pollution cover, with evidence before mobilisation and notice of cancellation.
- Price, payment schedule and retention
- Lump sum or rates, payment tied to milestones, and a retention percentage released on completion.
- Programme, delay and unforeseen conditions
- What extends the completion date and what does not.
- Variations
- Written, signed, priced, with the programme impact stated before the work proceeds.
- Indemnity, liability cap and consequential loss
- Mutual indemnity tied to fault, a cap with proper carve-outs, and a mutual exclusion of consequential loss.
- Termination and the state of the site on termination
- Cause and convenience, with a real number rather than a placeholder, and an obligation to leave the site safe and stable.
- Adjoining property and support provisions
- Optional. Notices required by municipal by-law where excavation may affect support, with a pre-condition survey of the neighbouring property.
- Consumer provisions
- Switched on for a homeowner client: prescribed information, deposit limits and cancellation rights under provincial consumer protection legislation.
Canadian demolition contract compliance checklist
Occupational health and safety, lien and holdback, and consumer protection are all provincial. Confirm each for the province where the property is located.
Complete the designated substances survey before tendering
In several provinces the owner of a project must determine whether designated substances are present, prepare the list including asbestos, and give it to every person submitting a tender — before the project is tendered.
Ontario Ministry of Labour — asbestos in the workplaceGive the designated substance report to the demolition contractor
The owner must supply the report to the contractor, not merely hold it. Bids priced without it are bids priced on the wrong information.
Use a competent worker for sampling and analysis
Sampling of suspect materials and analysis must be carried out in accordance with the applicable asbestos regulation.
File a notice of project where required
Occupational health and safety regulations require notice of project for projects of the kind they specify. Confirm the trigger in your province.
Obtain the municipal demolition permit and any heritage approval
Permits commonly attach conditions about hoarding, pest control and restoration of the site. Read them before pricing the programme.
Call the provincial one-call service before excavating
Locating underground services before excavation is commonly a statutory requirement with its own notice period and marking validity.
Canadian Common Ground Alliance — click before you digApply the statutory holdback and the lien timelines
Lien and holdback legislation is provincial, with set percentages, periods and steps for preserving and perfecting a lien. The contract cannot override it.
Respect prompt payment and adjudication timelines where they apply
Several provinces now impose prompt payment rules with strict periods for issuing a notice of non-payment in response to a proper invoice, and an adjudication process.
Decide salvage ownership before pricing
Steel, copper, brick and fixtures can be a meaningful share of contract value, and silence produces two different assumptions.
Check provincial consumer protection rules for a homeowner client
Prescribed contract information, deposit limits and cancellation rights apply to consumer agreements and override inconsistent terms.
How to complete the demolition contract
- Identify the property and the structures precisely. Address, title reference, and an itemised list of what comes down — plus an express list of what stays.
- Map the pre-start sequence and who does what. Name who commissioned the designated substances survey and when the report is due — it must be complete before tendering — then who files the notice of project, who obtains the demolition permit, and who requests the one-call locates.
- Decide salvage before you price the job. Choose whether the contractor keeps salvage, the owner keeps it, or specific items are reserved. If items are reserved, list them and set a collection deadline.
- Enter real insurance limits. Put numbers against commercial general liability, workers’ compensation board coverage and pollution cover, and set the date evidence and the clearance certificate are due.
- Build the payment schedule with retention. Tie payments to milestones, set the retention percentage and the release point, and state the basis on which late payment carries interest.
- Set the nuisance and neighbour controls. Working hours, dust suppression, vibration monitoring where relevant, the pre-condition survey of adjoining properties, and site security.
- Check the consumer position and fill in every number. If the owner is a homeowner, check the provincial consumer protection requirements and switch on the consumer block. Then fill in every number, taking the holdback percentage and period from your province’s lien legislation rather than from this template.
Demolition contracts in Canada — frequently asked questions
When does the designated substances survey have to be done?
Before the project is tendered, not after award. In several provinces the owner of a construction project must determine whether designated substances are present, prepare a list including asbestos, and provide it to every person submitting a tender — and must supply the report to the demolition contractor. Doing it later means bids were priced on incomplete information and a variation claim arrives on day one.
Who pulls the demolition permit?
Either party, but the contract must say which, because permit conditions drive the programme — hoarding, pest control, restoration of the site and hours of work are commonly attached. Most demolition contractors take the permit because the municipality deals with them. Whoever takes it, require a copy to be given to the other party and make the start date conditional on it.
How much holdback should I retain?
Whatever your province’s lien legislation requires, and for the period it specifies. This is not a commercial choice: the statutory holdback percentage, the period and the steps for releasing it are set by statute, as are the timelines for preserving and perfecting a lien. Take the numbers from the legislation, not from a template.
What are prompt payment rules and do they affect me?
Several provinces now impose prompt payment obligations with strict periods for paying a proper invoice and for issuing a notice of non-payment if you dispute it, backed by an adjudication process. Missing the notice period can leave an owner obliged to pay an amount it intended to dispute. Treat each invoice as starting a clock.
Do I have to call before digging?
Yes, in practice always. Locating underground services through the provincial one-call service before excavation is commonly a statutory requirement with its own notice period and marking validity, and demolition usually involves excavation for foundations, slabs and buried services. Record the ticket number and stop work if an unmarked line appears.
Who owns the salvage?
Whoever the contract says. Silence is the problem: demolition prices are often quoted assuming the contractor keeps the steel, copper and fixtures, while owners frequently assume the opposite. Decide explicitly, and list any items you want to keep with a deadline for collecting them.
Related templates
Disclaimer
This template and guide are general information only, not legal, tax, insurance, employment, consumer-credit, construction, dental or intellectual-property advice. No lawyer has reviewed your facts, and nothing here is certified as compliant with any law. Rules differ between jurisdictions and change over time — check the current position for your situation, and take professional advice before you sign or send.