A demolition contract allocates the work, the money, the risk and the regulatory duties. In Australia the licensing and notification layer is substantial: demolition of certain structures requires a licence held by the business doing it, notifiable demolition must be notified to the regulator in advance, and asbestos removal requires a separate class-specific licence with its own notice period.

The widely copied free template contains none of that. It is commercially reasonable and regulatorily silent, which in this trade is the wrong half to get right.

4 of 36 blanks filled

Tap any highlighted blank in the document below and type straight into it.Free — no sign-up, no watermark

Choose your version

Demolition Contract

This Demolition Contract is made on between of (the "Contractor"), holding , and of (the "Owner").

1. Property and structures

Property address:
Title reference:
Structures to be demolished:

The Owner warrants that it has lawful authority to authorise the demolition of the structures described, that it has disclosed all hazardous conditions, buried structures, tanks and services of which it is aware, and that no third party holds an interest that would prevent their demolition.

2. Scope of work

The Contractor will demolish the structures described, remove all resulting waste from the site, and leave the site in the following condition: . The work will be carried out in a good and workmanlike manner and in accordance with applicable law and the conditions of any consent or permit.

The following are expressly excluded and are not included in the Contract Price: . Anything not expressly included is excluded unless agreed by written variation.

3. Conditions precedent to starting work

The Contractor will not mobilise plant to the site, and demolition will not begin, until each of the following has been completed and evidence provided to the other party:

  • a hazardous materials survey of the structures, including an asbestos inspection, commissioned by , with the report provided by ;
  • confirmation that the Contractor holds the demolition work licence required under the work health and safety regulations for this class of demolition, and that any asbestos removal will be carried out by a holder of the correct class of asbestos removal licence;
  • written notice to the work health and safety regulator where the demolition is of a kind that must be notified, and written notice of licensed asbestos removal work at least five days before it starts, filed by by ;
  • development consent, demolition approval or any other approval the local council or planning authority requires, obtained by ;
  • a safe work method statement for the high risk construction work involved, prepared under the supervision of , together with the asbestos removal control plan where applicable;
  • confirmation that electricity, gas, water, telecommunications and sewerage have been disconnected and made safe, with the utilities notified at least working days in advance, and underground services located through the national referral service before any excavation.

4. Hazardous materials found despite the survey

If asbestos, lead paint, contaminated ground, a buried tank, refrigerant gases or any other hazardous or regulated material is encountered that was not identified in the survey, the Contractor will stop work in the affected area, secure it and notify the Owner immediately. The additional work will be priced and agreed by written variation before it proceeds. The cost is borne by the Owner, except to the extent the material should reasonably have been identified by a survey for which the Contractor was responsible.

5. Salvage and scrap

All salvage, scrap and arisings become the property of the Contractor on removal from the structure, and the Contract Price has been set on that basis.

6. Waste handling and documentation

The Contractor will transport and dispose of waste only at facilities lawfully able to receive it, will manage asbestos waste in accordance with the applicable removal and disposal requirements, and will deliver copies of weighbridge dockets, disposal receipts and any asbestos clearance certificate to the Owner within fourteen days of completion.

OptionalSet a waste diversion target

7. Site controls and neighbours

Work will be carried out only during . The Contractor will implement dust suppression, manage water used for suppression so that it does not discharge unlawfully from the site, and take reasonable measures to limit noise and disturbance to neighbouring occupiers.

OptionalInclude a pre-condition survey of adjoining properties

Before mobilisation the Contractor will carry out a photographic pre-condition survey of adjoining properties, boundaries, walls, driveways and highways likely to be affected, and provide a copy to the Owner.

OptionalInclude vibration monitoring
OptionalInclude site security and hoarding

The Contractor will secure the site with fencing or hoarding and appropriate signage, keep it secure outside working hours, and is responsible for preventing unauthorised access for the duration of the work.

OptionalInclude adjoining owner and dilapidation provisionsWhere the work affects a shared wall, a boundary structure or excavation near a neighbouring building.

8. Insurance

Before mobilisation and throughout the work the Contractor will maintain at its own expense:

  • public liability cover of not less than ;
  • workers’ compensation cover of not less than , as required by law;
  • pollution or environmental liability cover of not less than , general liability policies commonly excluding pollution;
  • cover for damage to surrounding property and for the works themselves, appropriate to the value and location of the project.

Evidence of cover will be provided by and on each renewal, and the Contractor will notify the Owner in writing of cancellation, non-renewal or material change.

9. Contract price and payment

The Contract Price is . Payment is made as follows: . Each payment is due within days of a valid invoice. Overdue amounts carry interest on the following basis: .

OptionalWithhold retention

The Owner will withhold retention of % from each payment, released on completion of the work, delivery of the waste documentation and reinstatement of the site to the agreed condition.

10. Programme

Work will commence on or about , subject to the conditions precedent being satisfied, and is to be complete by . The completion date is extended by delay caused by weather, concealed or unforeseen site conditions, governmental or regulatory action, late consent, labour disputes or other events beyond the Contractor’s reasonable control, with prompt notice to the Owner.

11. Variations

No change to the scope, the Contract Price or the programme takes effect unless recorded in writing and signed by both parties, stating the change, the price adjustment and the programme impact. Verbal instructions do not vary this contract.

12. Indemnity and limitation of liability

Each party indemnifies the other against claims, damages, losses and reasonable costs arising from its own negligent acts or omissions, breach of this contract or breach of applicable law. The Owner additionally indemnifies the Contractor against claims arising from hazardous conditions the Owner knew of and did not disclose.

Except for fraud, wilful misconduct, death or personal injury caused by negligence, and any liability that cannot lawfully be limited, each party’s total liability under this contract is limited to , and neither party is liable for indirect or consequential loss including loss of profit, rent or use.

13. Termination

Either party may terminate on written notice if the other materially breaches this contract and fails to remedy within days of written notice. The Owner may terminate for convenience on written notice, in which case the Contractor is entitled to payment for work properly performed plus reasonable demobilisation costs. On termination for any reason the Contractor will cease operations, leave the site safe and secure with any partially demolished structure made stable, remove its plant and submit a final invoice.

14. General

  • Variation: only by a written document signed by both parties.
  • Assignment: neither party may assign without the other’s written consent, except to a successor that assumes these obligations.
  • Entire agreement: this contract, the scope documents and any signed variations are the whole agreement on their subject matter.
  • Severability: if any provision is invalid or unenforceable the rest continues in force.
  • Notices: in writing, by hand, courier, recorded delivery or email with confirmation of receipt.
  • Counterparts and electronic signature: this contract may be signed in counterparts and electronically.

15. Governing law and disputes

This contract is governed by the law of . The parties will first attempt to resolve any dispute by good-faith negotiation between senior representatives, and failing that will submit it to .

Contractor

Date signed:

Property Owner

Date signed:

Licences, notifications and the five-day rule

The work health and safety regulations require a demolition work licence to be held by the business or undertaking carrying out demolition of the relevant class. A contractor who cannot produce the licence number for the work you are asking for is not the contractor for the job.

Notification is separate from licensing. Regulators require advance written notice of demolition of a structure or part of a structure that is load bearing or otherwise related to the physical integrity of the structure where it is at or above the height threshold — commonly expressed as six metres — with a notice period of several days before work starts. Licensed asbestos removal work must be notified in writing to the regulator at least five days before it begins.

The requirements and thresholds are set state by state under the model framework, so confirm them with your regulator rather than assuming the figure from another state. The template makes the licence, the notifications and the approvals express conditions precedent to mobilisation with named responsible parties and dates.

Asbestos classes and the control plan

Asbestos removal licensing is class-based: a Class A licence permits removal of friable asbestos, non-friable asbestos and asbestos contaminated dust, while a Class B licence is limited to non-friable asbestos and associated contaminated dust. Matching the class to the material found in the survey is the contractor’s job and the client’s risk.

Demolition is also high risk construction work, which brings a safe work method statement requirement, and licensed asbestos removal brings an asbestos removal control plan. The template requires both before mobilisation, together with the clearance certificate on completion of asbestos work.

Salvage, waste and the neighbours

Salvage is a material economic term and almost always missing from free templates. Steel, copper, brick, fixtures and plant can be worth a meaningful share of contract value, and prices are often quoted on the assumption the contractor keeps them. The template forces an explicit choice and allows specific items to be reserved to the owner with a collection deadline.

On waste, the template requires disposal only at facilities lawfully able to receive it, separate management of asbestos waste, and delivery of weighbridge dockets, disposal receipts and any clearance certificate to the owner. On neighbours, it adds working hours, dust suppression, optional vibration monitoring and a dilapidation report of adjoining property before work starts — which is the document that resolves the inevitable claim about a pre-existing crack.

Residential work has its own rules

Where the owner is a consumer, consumer guarantees under the Australian Consumer Law apply and cannot be excluded, restricted or modified — including the guarantee that services be rendered with due care and skill.

On top of that, states and territories regulate domestic and residential building work directly, commonly requiring a written contract with prescribed terms, limiting the deposit that may be taken, requiring home warranty or domestic building insurance above a value threshold, and giving a cooling-off period. Those requirements differ between jurisdictions and override inconsistent contract terms, so check your state before using this on a home.

Demolition contract clause guide

Parties, licence and registration details
Names both parties and records the contractor’s licence, registration or accreditation — absent from most free templates.
Property and structures in scope
Address, title reference, and an itemised list of what comes down, with anything excluded stated expressly.
Owner authority and disclosure warranty
The owner warrants authority to authorise demolition and that it has disclosed known hazardous conditions, tanks and services.
Scope, exclusions and final site condition
What is demolished, what is removed, what is left, the final levels, and an express list of what is not included.
Pre-start surveys as conditions precedent
The hazardous materials survey and the structural assessment, completed and provided before mobilisation rather than treated as background detail.
Regulatory notifications and consents
Who notifies whom, by when, who obtains the consent or permit, and the evidence to be given to the other party.
Utility disconnection and underground services
Services isolated and capped with documented evidence, and underground services located before any excavation.
Hazardous materials found despite the survey
Stop work, notify, price by written variation, and a clear rule on who bears the cost.
Salvage and scrap ownership
An explicit choice: contractor keeps salvage, owner keeps salvage, or listed items reserved. A material economic term, missing from free templates.
Waste handling and documentation
Licensed carriers and permitted sites only, with the transfer documentation delivered to the owner.
Dust, noise, vibration and adjoining properties
Suppression, working hours, vibration monitoring and a photographic pre-condition survey of the neighbours.
Site security and hoarding
Fencing, signage, out-of-hours security and responsibility for preventing unauthorised access.
Insurance with stated limits
Each cover named with a number, including pollution cover, with evidence before mobilisation and notice of cancellation.
Price, payment schedule and retention
Lump sum or rates, payment tied to milestones, and a retention percentage released on completion.
Programme, delay and unforeseen conditions
What extends the completion date and what does not.
Variations
Written, signed, priced, with the programme impact stated before the work proceeds.
Indemnity, liability cap and consequential loss
Mutual indemnity tied to fault, a cap with proper carve-outs, and a mutual exclusion of consequential loss.
Termination and the state of the site on termination
Cause and convenience, with a real number rather than a placeholder, and an obligation to leave the site safe and stable.
Adjoining owner and dilapidation provisions
Optional. Notice to adjoining owners where required, and a dilapidation report of the neighbouring property before work begins.
Consumer provisions
Switched on for a homeowner client: consumer guarantees preserved, and the state domestic building requirements given priority over inconsistent terms.

Australian demolition contract compliance checklist

Licensing, notification thresholds and residential building rules are set state by state under a model framework. Confirm each with your own regulator.

  • Confirm the contractor holds a demolition work licence

    The work health and safety regulations require a demolition work licence to be held by the business carrying out demolition of the relevant class.

    Safe Work Australia — demolition
  • Notify the regulator where the demolition is notifiable

    Advance written notice is required for demolition of a load bearing structure, or one otherwise related to the physical integrity of the structure, at or above the height threshold — commonly six metres. Confirm the threshold and notice period with your regulator.

  • Notify licensed asbestos removal at least five days ahead

    A licensed asbestos removalist must give written notice to the regulator at least five days before licensed asbestos removal work begins.

    Safe Work Australia — how to safely remove asbestos
  • Match the asbestos licence class to the material

    A Class A licence permits friable and non-friable asbestos and asbestos contaminated dust; a Class B licence is limited to non-friable asbestos and associated dust. The survey determines which is needed.

  • Prepare a safe work method statement

    Demolition is high risk construction work requiring a SWMS, and licensed asbestos removal requires an asbestos removal control plan.

    Safe Work Australia — demolition work code of practice
  • Obtain development consent and any council approval

    Demolition commonly requires development consent or a demolition approval from the local council, with heritage approval where relevant.

  • Confirm the disposal route and keep the documentation

    Dispose only at facilities lawfully able to receive the waste, manage asbestos waste separately, and keep weighbridge dockets, disposal receipts and clearance certificates.

  • Decide salvage ownership before pricing

    Steel, copper, brick, fixtures and plant can be a meaningful share of the contract value, and prices are often quoted on the assumption the contractor keeps them.

  • Check the state residential building requirements

    States and territories regulate domestic building work with prescribed contract terms, deposit limits, insurance requirements above a threshold and cooling-off periods. They override inconsistent terms.

  • Do not exclude consumer guarantees

    Consumer guarantees under the Australian Consumer Law, including due care and skill in supplying services, cannot be excluded, restricted or modified.

    ACCC — consumer guarantees

How to complete the demolition contract

  1. Identify the property and the structures precisely. Address, title reference, and an itemised list of what comes down — plus an express list of what stays.
  2. Map the pre-start sequence and who does what. Record the demolition work licence number, name who files the regulator notification and when, who gives the five-day asbestos notice, who obtains development consent, and who arranges the disconnections and the underground locate.
  3. Decide salvage before you price the job. Choose whether the contractor keeps salvage, the owner keeps it, or specific items are reserved. If items are reserved, list them and set a collection deadline.
  4. Enter real insurance limits. Put numbers against public liability, workers’ compensation and pollution cover, and set the date evidence is due. Ask specifically about pollution, which general liability policies commonly exclude.
  5. Build the payment schedule with retention. Tie payments to milestones, set the retention percentage and the release point, and state the basis on which late payment carries interest.
  6. Set the nuisance and neighbour controls. Working hours, dust suppression, vibration monitoring where relevant, the pre-condition survey of adjoining properties, and site security.
  7. Check the consumer position and fill in every number. If the owner is a homeowner, check your state’s domestic building requirements — prescribed terms, deposit limits, insurance and cooling-off — and switch on the consumer block. Then fill in every number before signing.

Demolition contracts in Australia — frequently asked questions

Does the contractor need a demolition licence?

For demolition of the relevant class, yes — the work health and safety regulations require a demolition work licence held by the business carrying out the work. Ask for the licence number and check it covers the class of demolition you are asking for. A contractor who cannot produce it is not the contractor for the job.

When must a demolition be notified to the regulator?

Advance written notice is generally required for demolition of a structure, or part of a structure, that is load bearing or otherwise related to the physical integrity of the structure, where it is at or above the height threshold — commonly stated as six metres — with a notice period of several days. The thresholds and periods are set state by state under the model framework, so confirm them with your own regulator.

How much notice does asbestos removal need?

A licensed asbestos removalist must give the regulator written notice at least five days before licensed asbestos removal work starts. That is separate from, and shorter than, the demolition notification. Note also that the licence is class-based: Class A covers friable and non-friable asbestos and contaminated dust, Class B is limited to non-friable asbestos and associated dust.

Who owns the salvage?

Whoever the contract says. Silence is the problem, because demolition prices are frequently quoted on the assumption the contractor keeps the steel, copper, brick and fixtures, while owners frequently assume the opposite. Decide explicitly, and if you want to keep particular items, list them and set a deadline for collecting them.

What insurance should a demolition contractor carry?

Public liability with a stated limit, workers’ compensation as required in the state or territory, and — the one most often missed — pollution or environmental liability, because general liability policies commonly exclude pollution and demolition routinely disturbs regulated material. Require evidence before mobilisation rather than "upon request".

Can I use this for demolishing a house?

Only after checking your state or territory’s domestic building requirements. Those commonly prescribe contract terms, limit the deposit that may be taken, require home warranty or domestic building insurance above a value threshold, and give a cooling-off period — and they override inconsistent contract terms. Consumer guarantees under the Australian Consumer Law also apply and cannot be excluded.

Related templates

Disclaimer

This template and guide are general information only, not legal, tax, insurance, employment, consumer-credit, construction, dental or intellectual-property advice. No lawyer has reviewed your facts, and nothing here is certified as compliant with any law. Rules differ between jurisdictions and change over time — check the current position for your situation, and take professional advice before you sign or send.